29-12-04 12 -16029-12-04 12A-16029-12-04 12B-16029-14-04 05A-03029-14-04 05C-03029-14-04 05D-030 29-14-04 05E-03029-14-04 05F-03029-14-04 05A-05029-14-04 05C-05029-14-04 05D-050 29-14-04 05E-05029-14-04 05F-05029-34-04 01 -07029-34-04 01A-07029-12-04 12 -20029-12-04 12A-20029-12-04 12B-20029-34-04 01 -07029-34-04 01A-070
D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 12-12-29-611-002
20-28-00-912-004
24-41-00-861-002 24-41-00-862-002 29-00-00-864-001
Fill the Hydraulic Fluid Reservoir with a Hand PumpFill the Hydraulic Fluid Reservoir with a Hydraulic Service CartElectrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-Energize the Aircraft Electrical Circuits from the External PowerDe-energize the Aircraft Electrical Circuits Supplied from the External PowerPut the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R R R R R 29-00-00-870-008 29-00-00-870-009 29-00-00-870-010 29-00-00-910-002 29-10-00-863-003 29-10-00-864-003 29-14-00-614-001 29-14-00-614-002 29-31-00-710-001 29-34-00-710-001 31-60-00-860-001 31-60-00-860-002 Bleeding Procedure of the Blue Hydraulic System Upstream of the Blue E-Pump Bleeding Procedure of the Blue Hydraulic System Downstream of the Blue E-Pump Ram Air Turbine System Bleeding ProcedureSafety Procedures of the Hydraulic SystemPressurize the Blue Hydraulic System with a Ground Power SupplyDepressurize the Blue Hydraulic SystemDepressurization of the Hydraulic ReservoirsPressurization of the Hydraulic Reservoirs through the Ground ConnectorFunctional Check of Reservoir Low Level WarningOperational Test of Reservoir Low Air Pressure WarningEIS Start ProcedureEIS Stop Procedure
3. Job Set-up__________
Subtask 29-12-41-860-053
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES._______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2) Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).
(3) Make sure that the reservoir of the Blue hydraulic system is depressurized. (Ref. TASK 29-14-00-614-001).
(4) Make sure that the access platform is in position at the access door 197EB.
(5) Make sure that the access doors 197EB and 197FB are open.
(6) Make sure that the container is in position below the location of the Blue reservoir.
(7) Make sure that the warning notices are in position to tell persons not to pressurize the Blue hydraulic system: - in the cockpit on the hydraulic section 40VU of the overhead panel, - on the ground service panel of the Blue hydraulic system.
Subtask 29-12-41-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12 121VU HYDRAULIC/LOW/LVL/IND 1832GQ N32 121VU HYDRAULIC/HYD/QTY/IND 1831GQ P35 123VU B HYD/ELEC PUMP 2701GJ AB09
4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-149, 201-299,
Subtask 29-12-41-560-050
A. Preparation of the Replacement Component
(1)
Remove the parts which are attached to the removed reservoir as follows:
(a)
Remove and discard the lockwire from the reducer (3).
(b)
Remove the reducer (3) and discard the O-ring (4).
(c)
Remove and discard the lockwire from the pressure switch (29).
(d)
Remove the pressure switch (29) and discard the O-ring (30).