• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:37来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 


 TASK 29-12-37-000-002
 Removal of the Check Valve 2170GM(2405GM)
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)
 No specific access platform 3.5 m (11 ft. 6 in.)
 No specific container 5 l (1.3208 USgal)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-50-00-866-008 Extension of the Flaps on the Ground 27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance 29-10-00-864-003 Depressurize the Blue Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-12-37-991-002 Fig. 402 29-12-37-991-003 Fig. 403
R FOR FIN 2170GM R 57-51-37-000-004 Removal of the Access Panels R 575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB R (675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R  FOR FIN 2405GM 57-51-37-000-004  Removal of the Access Panels 575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB (675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
 3. Job Set-up__________
 (Ref. Fig. 402/TASK 29-12-37-991-002, 403/TASK 29-12-37-991-003)
 Subtask 29-12-37-860-051
 A. Aircraft Maintenance Configuration
 (1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
 (2) Make sure the LOCKING TOOL - FLAP/SLAT CONTROL LEVER (98D27803000000) is on the flap/slat control lever on panel 114VU.
 (3) Remove the safety collar from the circuit breakers 10CV and 12CV.
 (4) Extend the No.3 spoiler for maintenance (Ref. TASK 27-60-00-866-002).
 (5) Put the COLLAR-SAFETY, SPOILER (98D27604000000) on the piston rod of the servo-control.
 Subtask 29-12-37-865-051
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08 49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07 49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12 105VU FLT CTL/SEC1/STBY SPLY 22CE B01 121VU FLIGHT CONTROLS/WTB/FLP/SYS2 12CV P20 121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21 121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19 121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18 122VU FLIGHT CONTROLS/WTB/FLP/SYS1 10CV S07 123VU B HYD/ELEC PUMP 2701GJ AB09

 

 Flap WTB Check Valve 2170GM
 Figure 402/TASK 29-12-37-991-002
 1EFF :  ALL  1  29-12-37 Page 413 
1  1  Feb 01/98
 1  1
 1CES  1

 

 Flap WTB Check Valve 2405GM
 Figure 403/TASK 29-12-37-991-003
 1EFF :  ALL  1  29-12-37 Page 414 
1  1  Feb 01/98
 1  1
 1CES  1

 

 Subtask 29-12-37-864-051
 C. Depressurize the Applicable Hydraulic System
 (1)
 Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).

 (2)
 Depressurize the Blue hydraulic-system reservoir (Ref. TASK 29-14-00-614-001).


 Subtask 29-12-37-010-051
 D. Get Access
 (1)
 Put an access platform below the applicable access panel.

 (2)
 Remove the applicable access panel:

 -
FOR 2170GM
 remove 575DB (Ref. TASK 57-51-37-000-004)


 -
FOR 2405GM remove 675DB (Ref. TASK 57-51-37-000-004).

 

 (3)
 Put a container below the applicable check valve.


 4. Procedure
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压3(55)