• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:37来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_________
 (Ref. Fig. 401/TASK 29-12-38-991-001) Subtask 29-12-38-420-050
 A. Installation of the Check Valve CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.
 CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
 LUBRICANT.

 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Make sure that the hydraulic line end-fittings are serviceable.

 (4)
 Remove the blanking plugs.

 (5)
 Lubricate the new O-ring (2) with HYDRAULIC FLUIDS (Material No. 02-003).

 (6)
 Put the O-ring (2) in position on the check valve (3).

 (7)
 Install the check valve (3) on the tee-fitting (1).


R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-12-38Page 406 1 1 May 01/05 1 1 1CES 1


 (8)
 Hold the Tee-fitting (1) and TORQUE the check valve (3) to between

 4.32 and 4.61 m.daN (31.85 and 33.99 lbf.ft).

 (9)
 Apply HYDRAULIC FLUIDS (Material No. 02-003) to the end fitting (4).


 (10)
 Connect the end-fitting (4) to the check valve (3).

 (11)
 Hold the check valve (3) and TORQUE the end fitting (4) to between


 7.5 and 8.3 m.daN (55.30 and 61.20 lbf.ft). Subtask 29-12-38-865-052
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 2701GJ, 2702GJ
 Subtask 29-12-38-790-050
 C. Test
 (1)
 Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-002).

 (2)
 Make sure that the level of fluid in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002).

 (3)
 Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).

 (4)
 Examine the connections of the check valve (3) and make sure that there are no leaks.

 (5)
 Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).

 (6)
 Do the operational and the functional test of the RAT (Ref. TASK 29-22-00-720-001).


 5. Close-up
________ Subtask 29-12-38-942-050
 A. Put the aircraft back to the serviceable condition.
 (1)
 Remove the container.

 (2)
 Remove the warning notice(s).


R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-12-38Page 407 1 1 May 01/05 1 1 1CES 1 Subtask 29-12-38-410-050


 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access door 195BB.


R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-12-38Page 408 1 1 May 01/05 1 1 1CES 1 RESERVOIR (2000GQ) - REMOVAL/INSTALLATION


_________________________________________
 TASK 29-12-41-000-001
 Removal of the Blue Hydraulic Reservoir
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)
 No specific warning notices
 No specific access platform 2.30 m (7 ft. 7 in.)
 No specific container 5.0 l (1.3208 USgal)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action
 29-00-00-910-002 Safety Procedures of the Hydraulic System
 29-10-00-680-003 Drainage of the Reservoir of the Blue Hydraulic

 System
 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs

R **ON A/C 001-049, 051-099, 101-149, 201-299,
 29-12-41-991-001 Fig. 401 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压3(60)