__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific access platform 2.06 m (6 ft. 9 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 28-42-34-991-001 Fig. 401
3. Job Set-up
__________ Subtask 28-42-34-861-050
A. Energize the ground service network (Ref. TASK 24-42-00-861-001).
1EFF : ALL 1 28-42-34Page 401 1 1 Feb 01/98 1 1 1CES 1 Subtask 28-42-34-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/FQI/CHAN/1 1QT A13 121VU FUEL/FQI/CHANNEL/1 AND 2 8QT L26 121VU FUEL/FQI/CHAN/2 2QT M27
Subtask 28-42-34-010-050
C. Get Access
(1)
Put the access platform in position at the access door 811.
(2)
Open the access door 811.
4. Procedure
_________ (Ref. Fig. 401/TASK 28-42-34-991-001) Subtask 28-42-34-020-050
A. Removal of the FQIC (3QT)
(1)
Loosen the knurled nuts (3).
(2)
Remove the FQIC (4) from its rack (2).
(3)
Put blanking caps on the disconnected electrical connectors.
1EFF : ALL 1 28-42-34Page 402 1 1 Feb 01/98 1 1 1CES 1
Fuel Quantity-Indicating Computer (FQIC)
Figure 401/TASK 28-42-34-991-001
1EFF : ALL 1 28-42-34 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 28-42-34-400-001
Installation of the Fuel Quantity-Indicating Computer (FQIC) (3QT)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2.06 m (6 ft. 9 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power
24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power
28-42-00-740-001 Status Report (BITE)
28-46-00-740-001 Functional (BITE) Test
R 32-69-00-860-001 Simulation of Flight, with the Aircraft on the Ground 28-42-34-991-001 Fig. 401
3. Job Set-up
__________
Subtask 28-42-34-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
(2)
Make sure that the access platform is in position at the access door
811.
(3)
Make sure that the access door 811 is open.
1EFF : ALL 1 28-42-34Page 404 1 1 Aug 01/04 1 1 1CES 1 1EFF : ALL 1 28-42-34Page 405 1 1 Aug 01/04 1 1 1CES 1
Subtask 28-42-34-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/FQI/CHAN/1 1QT A13 121VU FUEL/FQI/CHANNEL/1 AND 2 8QT L26 121VU FUEL/FQI/CHAN/2 2QT M27
4. Procedure_________
(Ref. Fig. 401/TASK 28-42-34-991-001)
Subtask 28-42-34-420-050
A. Installation of the FQIC (3QT)
(1) Remove the blanking caps from the electrical connectors.