• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 07:03来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (e)
 Attach the harness 14QT1(14QT2) to the structure and the fuel probe 24QT1(24QT2) body with the cable-ties (1).

 (f)
 Identify the cable ends for the sensor 23QJ1(23QJ2).

 (g)
 Identify the cable ends for the sensor 15QJ1(15QJ2).

 (h)
 Connect the applicable cables to the terminal of the sensor 15QJ1(15QJ2) and tighten the screws (20).

 (i)
 Put each cable in its clamp (22) and tighten the screws (21).

 (j)
 Put the cable for the sensor 15QJ1(15QJ2) in position.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page 468 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 (k)
 Attach the harness 14QT1(14QT2) to the structure with the cable-ties (1).

 (l)
 Install the nylon spacers (5) between the applicable harnesses with the cable-ties (1).

 (m)
 Remove the bolt (4) and the P clip (3).

 (n)
 Make a coil of the unwanted cable and attach it to the structure with the P clip (3) and the bolt (4).

 (o)
 Identify the applicable cable ends for the sensors 23QJ1(23QJ2) and 24QJ1(24QJ2).

 (p)
 Connect the applicable cables to the terminal of the sensors 23QJ1(23QJ2) and 24QJ1(24QJ2) and tighten the screws (20).

 (q)
 Put the cables for the sensors 23QJ1(23QJ2) and 24QJ1(24QJ2) in position.

 (r)
 Make a coil of the unwanted cable and attach it to the structure with the cable-ties (1).

 (s)
 Get access through the door 540AZ(640AZ) to RIB1.

 (t)
 Carefully pull the cables for the fuel probe 22QT1(22QT2), until it reaches the fuel probe.

 (u)
 Identify the end of the cables for the fuel probe 22QT1(22QT2).


 (v) Use a crimping tool to crimp the correct color terminal R connectors (2) to the color identified wires (Ref. ESPM 203222).
 (w)
 Connect the terminal connectors (2) to the terminals of the terminal block of the fuel probe 22QT1(22QT2).

 (x)
 Put the cable for the fuel probe 22QT1(22QT2) in position.

 (y)
 Attach the harness 14QT1(14QT2) to the fuel probe 22QT1(22QT2) body and the structure with the cable-ties (1).

 (z)
 Make a coil of the unwanted cable and attach it to the structure with the cable-ties (1).


 (aa) Get access through the opening 540AB(640AB).
R 1EFF : 106-149, 229-299, 401-499, 1 28-42-43Page 469 1 1 Aug 01/05 1 1 1CES 1


 (ab) Use the string to carefully pull the harness 14QT1(14QT2) through the conduit, until the cables come into view.
 (ac) Remove and discard the string and the tape from the harness.
 (3) Install the harness 14QT1 (14QT2) between RIB 3 and RIB 4 as follows: (Ref. Fig. 407/TASK 28-42-43-991-010)
 (a) Identify the cable ends for the fuel probe 26QT1(26QT2).
 (b)
 Use a crimping tool to crimp the correct color terminal R connectors (2) to the color identified wires (Ref. ESPM 203222).

 (c)
 Connect the terminal connectors (2) to the terminals of the terminal block of the fuel probe 26QT1(26QT2).

 (d)
 Put the cable for the fuel probe 26QT1(26QT2) in position.

 (e)
 Attach the harness 14QT1(14QT2) to the fuel probe 26QT1(26QT2) body and the structure with the cable-ties (1).

 (f)
 Get access through the opening 540BB(640BB) to RIB7 and find the end of the string at the end of the conduit.

 (g)
 Use the string to carefully pull the harness through the conduit until it comes into view.

 (h)
 Remove and discard the string and the tape from the harness.


 (4) Install the harness 14QT1 (14QT2) between RIB 7 and RIB 8 as follows:
 (a) Identify the cable ends for the fuel probe 28QT1(28QT2).

 (b)
 Use a crimping tool to crimp the correct color terminal R connectors (2) to the color identified wires (Ref. ESPM 203222).

 (c)
 Connect the terminal connectors (2) to the terminals of the terminal block of the fuel probe 28QT1(28QT2).

 (d)
 Put the cables of the fuel probe 28QT1(28QT2) in position.

 (e)
 Attach the harness 14QT1(14QT2) to the fuel probe 28QT1(28QT2) body and the structure with the cable-ties (1).

 (f)
 Get access through the opening 540CB(640CB) to RIB9 and find the string at the end of the conduit.

 


R 1EFF : 106-149, 229-299, 401-499, 1 28-42-43Page 470 1 1 Aug 01/05 1 1 1CES 1


 (g)
 Use the string to carefully pull the harness through the conduit until it comes into view.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油5(105)