• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 07:03来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING_______ NOTICES ARE IN POSITION.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING_______ GEAR.
 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R R RR R RR R R  No specific safety barriers FOR FIN 21QT1, 21QT2 No specific Torque Wrench : range 0.00 to 1.20 m.daN (0.00 to 9.00 lbf.ft) FOR FIN 54QT1, 54QT2 No specific Torque Wrench : range 0.00 to 1.20 m.daN (0.00 to 9.00 lbf.ft) FOR FIN 23QT1, 23QT2, 56QT1, 56QT2, 25QT1, 25QT2, 26QT1, 26QT2, 27QT1, 27QT2, 28QT1, 28QT2, 29QT1, 29QT2, 30QT1, 30QT2, 59QT1, 59QT2, 60QT1, 60QT2, 61QT1, 61QT2, 34QT1, 34QT2 No specific Torque Wrench : range 0.00 to 1.20 m.daN (0.00 to 9.00 lbf.ft) 

 

R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R  Material No. 11-026  GB DEF-STAN 68-148/1 
R  SOLVENT GENERAL PURPOSE (Ref. 20-31-00) 
R  Material No. 19-003  USA AMS 3819 
R  LINT-FREE COTTON CLOTH (Ref. 20-31-00) 

R C. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R  12-11-28-650-003  Pressure Refuel with Automatic Control 
R  20-28-00-912-002  Electrical Bonding of Components With Conductive 
R  Bolts and Screws in the Tanks 
R  28-10-00-910-001  Safety Procedures When You Do Work in a Fuel Tank 
R  28-10-00-910-002  Access to the Fuel Tanks and the Work Areas 
R  28-25-00-650-001  Pressure Defuel 
R  28-25-00-869-001  Fuel Transfer 
R  28-42-00-740-001  Status Report (BITE) 
R  57-27-11-000-001  Removal of the Access Panel (540AB, 540BB, 540CB, 
R  540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB, 
R  640DB, 640EB, 640FB, 640GB) 
R  57-27-11-000-002  Removal of the Access Panel (540HB, 540JB, 540KB, 
R  540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 
R  550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, 
R  ....) 
R  57-27-11-400-001  Installation of the Access Panel (540AB, 540BB, 
R  540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 
R  640CB, 640DB, 640EB, 640FB, 640GB) 
R  57-27-11-400-002  Installation of the Access Panel (540HB, 540JB, 
R  540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 
R  550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 
R  ....) 
R  FOR FIN 21QT1, 21QT2 
R  20-28-00-912-002  Electrical Bonding of Components With Conductive 
R  Bolts and Screws in the Tanks 
R  28-42-15-991-004  Fig. 405 
R  FOR FIN 54QT1, 54QT2 
R  20-28-00-912-002  Electrical Bonding of Components With Conductive 
R  Bolts and Screws in the Tanks 
R  28-42-15-991-005  Fig. 406

 1EFF : 301-399, 1 28-42-15Page 434 1 1 May 01/04 1 1 1CES 1 1EFF : 301-399, 1 28-42-15Page 435 1 1 May 01/04 1 1 1CES 1 1EFF : 301-399, 1 28-42-15Page 436 1 1 May 01/04 1 1 1CES 1 1EFF : 301-399, 1 28-42-15Page 437 1 1 May 01/04 1 1 1CES 1 1EFF : 301-399, 1 28-42-15Page 438 1 1 May 01/04 1 1 1CES 1 1EFF : 301-399, 1 28-42-15Page 439 1 1 May 01/04 1 1 1CES 1 1EFF : 301-399, 1 28-42-15Page 440 1 1 May 01/04 1 1 1CES 1 1EFF : 301-399, 1 28-42-15Page 441 1 1 May 01/04 1 1 1CES 1 1EFF : 301-399, 1 28-42-15Page 442 1 1 May 01/04 1 1 1CES 1 TASK 28-42-15-000-004


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
R  FOR FIN 23QT1, 23QT2, 56QT1, 56QT2, 25QT1, 25QT2, 26QT1, 26QT2, 27QT1, 27QT2, 
R  28QT1, 28QT2, 29QT1, 29QT2, 30QT1, 30QT2, 59QT1, 59QT2, 60QT1, 60QT2, 61QT1, 
R  61QT2, 34QT1, 34QT2 
R  28-42-15-991-006 Fig. 407 
R  3. Job Set-up__________ 
R  Subtask 28-42-15-941-059 
R  A. Safety Precautions 
R  WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK._______ 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油5(65)