 (2)
 Remove the warning notice(s).

 (3)
 Remove the access platform(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-15Page 412 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 28-42-15-000-002


 Removal of the Center Tank Fuel-Quantity-Probe (35QT, 36QT, 37QT, 38QT, 39QT)
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific circuit breaker(s) safety clip(s) No specific safety barriers No specific warning notice No specific access platform 2.5 m (8 ft. 2 in.) 460005835 1 GROUND LOCK SLEEVE
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
28-10-00-910-001 Safety Procedures When You Do Work in a Fuel Tank 28-10-00-910-002 Access to the Fuel Tanks and the Work Areas 28-25-00-650-001 Pressure Defuel 28-25-00-650-003 To Drain Remaining Fuel from the Wing Tanks and the
 Center Tank 32-12-00-010-001 Open the Main Gear Doors for Access 57-17-11-000-001 Removal of the Covers 147AZ (148AZ) 28-42-15-991-003 Fig. 403
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-15Page 413 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 3. Job Set-up
__________ Subtask 28-42-15-941-061
 A. Safety Precautions WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
 (1)
 You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.

 (2)
 Put the safety barriers in position.

 (3)
 Put a warning notice in position to tell persons not to operate the MLG doors.


 Subtask 28-42-15-650-054
 B. Fuel Configuration
 (1)
 Defuel the applicable fuel tank (Ref. TASK 28-25-00-650-001).

 (2)
 Drain the remaining fuel from the applicable fuel tank (Ref. TASK 28-25-00-650-003).


 Subtask 28-42-15-865-051
 C. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/FQI/CHAN/1 1QT A13 121VU FUEL/FQI/CHANNEL/1 AND 2 8QT L26 121VU FUEL/FQI/CHAN/2 2QT M27
 Subtask 28-42-15-010-051
 D. Get Access WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
_______
 (1)
 Open the applicable MLG door(s) (Ref. TASK 32-12-00-010-001).

 (2)
 Make sure that the GROUND LOCK SLEEVE is installed on the applicable MLG door actuator(s).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-15Page 414 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 (3)
 Put the access platform in position below the applicable access panel 147AZ (148AZ).

 (4)
 Remove the applicable access panel 147AZ and/or 148AZ (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-17-11-000-001).


 4. Procedure
_________
 (Ref. Fig. 403/TASK 28-42-15-991-003) Subtask 28-42-15-020-058
 A. Removal of the Center-Tank-Fuel-Quantity-Probes
 CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU

_______ DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE DAMAGE TO EQUIPMENT.
 (1)
 Cut the cable ties (7) and (8). Remove all the cut cable ties from the tank and discard.

 (2)
 Disconnect the electrical cables (3) from the probe (2) and put blanking caps on the electrical cables (3).


 NOTE : Probe 39QT also has CIC connections.
____
 (3)
 Hold the probe (2) and remove the bolts (4) and the washers (5) and, for probes 35QT and 36QT, the nuts (6).
 