R  (1) You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) 
R  when you do work in a fuel tank. 
R  (2) Make sure that the safety barriers are in position. 
R  Subtask 28-42-15-860-050 
R  B. Aircraft Maintenance Configuration 
R  (1) Make sure that the applicable fuel tank is defueled (Ref. TASK 28-25-
R  00-650-001). 
R  (2) Make sure that the access platform is below the applicable access 
R  panel. 
R  (3) Make sure that the applicable access panel has been removed 
R  (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-001) or 
R  (Ref. TASK 57-27-11-000-002): 
R  - FOR 21QT1, 23QT1, 25QT1, 26QT1, 54QT1, 56QT1 
R  remove 540AB 
R  - FOR 28QT1, 27QT1 
R  remove 540BB 
R  - FOR 29QT1 
R  remove 540DB 
R  - FOR 30QT1 
R  remove 540FB 
R  - FOR 34QT1 
R  remove 540QB 
R  - FOR 59QT1 
R  remove 540HB.

 

R  - FOR 21QT2, 23QT2, 25QT2, 26QT2, 54QT2, 56QT2 
R  remove 640AB 
R  - FOR 28QT2, 27QT1 
R  remove 640BB 
R  - FOR 29QT2 
R  remove 640DB 
R  - FOR 30QT2 
R  remove 640FB 
R  - FOR 34QT2 
R  - remove 640QB 
R  - FOR 59QT2 
R  remove 640HB. 
R  (4) Make sure that the spring-loaded surge door 540AZ (640AZ) is open and 
R  safetied with the HOOK-COVER (RIB 2 SURGE DOORS). 
R  (5) Make sure that the spring-loaded surge door 540BZ (640BZ) is open and 
R  safetied with the HOOK-COVER (RIB2-SURGE DOORS). 
R  Subtask 28-42-15-865-063 
R  C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and 
R  tagged 
R  -------------------------------------------------------------------------------
R  PANEL DESIGNATION IDENT. LOCATION 
R  -------------------------------------------------------------------------------
R  49VU FUEL/FQI/CHAN/1 1QT A13 
R  121VU FUEL/FQI/CHANNEL/1 AND 2 8QT L26 
R  121VU FUEL/FQI/CHAN/2 2QT M27 
R  4. Procedure_________ 
R  Subtask 28-42-15-420-057 
R  A. Preparation for Installation 
R  (1) Clean the component interfaces and the adjacent areas with a 
R  MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS 
R  (Material No. 11-026). 
R  (2) Do an inspection of the component interface and/or the adjacent area. 
R  (3) Make sure that the parts retained from the removed component are 
R  clean and in the correct condition.

 

R  Subtask 28-42-15-420-058 
R  B. Installation of the Fuel-Quantity-Probe 
R  CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU_______ 
R  CONNECT THE ELECTRICAL WIRES. 
R  INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO 
R  EQUIPMENT. 
R  FOR 21QT1, 21QT2 
R  (Ref. Fig. 405/TASK 28-42-15-991-004) 
R  (1) Installation of the probe 21QT1 (21QT2): 
R  (a) Install the bracket (13) on the probe (11). 
R  (b) Put the probe (11) in the correct position and loosely install 
R  the bolts (12), the bolts (10) and the washers (9). 
R  (c) Measure the clearance between the structure and the top and 
R  bottom of the probe(11). Make sure that the clearance is a 
R  minimum of 7.0 mm (0.2755 in.). 
R  NOTE : When a probe is installed, a minimum clearance of 7.0 mm____ 
R  (0.2755 in.)is recommended. (A clearance of less than 7.0 
R  mm (0.2755 in.) but more than 5.0 mm (0.1968 in.) is 
R  acceptable, if local installation does not allow the 
R  recommended clearance) 
R  (d) To prevent possible static discharge, make sure that the fuel 
R  probe is not less than 5.0 mm (0.1968 in.)from: 
R  - the nearest structure 
R  - rib and tank wall 
R  - pipework 
R  - brackets and p-clips 
R  - fasteners and other metal parts. 
R  (e) TORQUE the bolts (10) to between 0.45 and 0.56 m.daN (39.82 and 
R  49.55 lbf.in) (Ref. TASK 20-28-00-912-002). 
 