R - the screw (7) to between 0.316 and 0.362 m.daN (27.96 and 32.03
R lbf.in).
R (h) Put the cable (10) in position under the clamp block (8) and
R TORQUE the clamp screw (9) to between 0.023 and 0.045 m.daN (2.03
R and 3.98 lbf.in).
R (i) Install the cable ties (2), as necessary, to attach the cable
R (10) to the probe (11).
R Subtask 28-42-15-865-064
R C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
R breaker(s):
R 1QT, 2QT, 8QT.
R Subtask 28-42-15-740-054
R D. Test
R (1) Do a status report (BITE) of the FQI system (Ref. TASK 28-42-00-740-
R 001).
R 5. Close-up________
R Subtask 28-42-15-410-056
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (2) Make sure that all of the bonding straps are correctly installed and
R attached (Ref. TASK 20-28-00-912-002), before you install the
R fuel-tank access panels.
R (3) Remove the HOOK-COVER (RIB 2 SURGE DOORS) and carefully close the
R spring-loaded surge door 540AZ (640AZ).
R (4) Remove the HOOK-COVER (RIB2-SURGE DOORS) and carefully close the
R spring-loaded surge door 540BZ (640BZ).
R (5) Install the applicable access panels (Ref. TASK 57-27-11-400-001) or
R (Ref. TASK 57-27-11-400-002):
R - FOR 21QT1, 23QT1, 25QT1, 26QT1, 54QT1, 56QT1
R - install 540AB:
R - FOR 28QT1, 27QT1
R - install 540BB:
R - FOR 29QT1
R - install 540DB:
R - FOR 30QT1
R - install 540FB:
R - FOR 34QT1
R - install 540QB:
R - FOR 59QT1
R - install 540HB:
R - FOR 21QT2, 23QT2, 25QT2, 26QT2, 54QT2, 56QT2
R - install 650AB:
R - FOR 28QT2, 27QT1
R - install 640BB:
R - FOR 29QT2
R - install 640DB:
R - FOR 30QT2
R - install 640FB:
R - FOR 34QT2
R - install 640QB:
R - FOR 59QT1
R - install 640HB.
R Subtask 28-42-15-650-052
R B. Fuel Configuration
R (1) Refuel, defuel or transfer fuel as necessary (Ref. TASK 12-11-28-650-
R 003), (Ref. TASK 28-25-00-650-001) or (Ref. TASK 28-25-00-869-001).
R Subtask 28-42-15-942-054
R C. Removal of Equipment
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油5(68)