曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
5.4.1.1.4
Test Procedure
Review (LLR)
A B • Test Procedures
• Configuration
Management
5.4.1.2.5 5.4.1.2.6 5.4.1.2.7 5.4.1.2.8 5.4.1.2.9
D E
Software Configuration Management 5.4.2
Dave Jensen/John Howard
7
CAAC New Technology Seminar – GBAS 29-30 October 2009
Software Quality Assurance 5.4.3
Honeywell.com
SDA Systems/Safety/Verification/Training
SDA Item Evaluation
System Engineering
• Requirements, Verification & Validation, Traceability,
Design Reviews, Requirement Management, Change
Management, Personnel Safety , Human Factors,
(SAE/ARP-4754)
g y
Security, Reliability, Interface Control Documents,
System Architecture, Quality Assurance
• 14 System Safety Assessment
(SAE/ARP-4754 & ARP-4761)
GPS Integrity Monitor Algorithms
• FAA LAAS Integrity Panel (LIP) - FAA and Key
Technical Advisors approval of Safety Compliance
and Safety Assessment
System Verification
(FAA-E-AJW44-2937A)
• Demonstrate compliance with minimum performance
requirements for non-Fed LAAS Ground Facility
Commercial Instruction Book • Installation Configuration Operation Maintenance
(FAA-D-2494)
Installation, Configuration, Operation, Maintenance,
Procedures, Troubleshooting, Parts Lists
Training Program • Classroom, OJT Criteria, Examination, Certification
Dave Jensen/John Howard
8
CAAC New Technology Seminar – GBAS 29-30 October 2009
Honeywell.com
Total GBAS SDA Effort
• 3 Years of Design, Development, and Verification
• Over 230 Documents Submitted for Review
• 23 Formal FAA Audits and Reviews
• 10 Formal Internal Design Reviews
• Over 2500 Hardware and Software Requirements
– Representing 21 subsystems
– Peer-reviewed, change controlled
• Over 1500 GPS Corrections and Monitor Requirements
– Representing 14 integrity monitors
• Over 2000 Test Cases
– To fully verify 4000+ requirements
• Over 1200 Test Procedures
– To implement 2000+ test cases
Peer Dave Jensen/John Howard
9
CAAC New Technology Seminar – GBAS 29-30 October 2009
– Peer-reviewed and formally run
Honeywell.com
Aspects of Facility Approval (FAA)
• Operational Concept
• Technical Performance
• Physical Integration
• Functional Integration
• Human Integration
• System Security
• In-Service Support
• Test and Evaluation
• Implementation and Transition
• Quality Assurance
• Configuration Management
• In-Service Management
• Safety Plan
Dave Jensen/John Howard
10
CAAC New Technology Seminar – GBAS 29-30 October 2009
y
Honeywell.com
Facility Approval Activities
• Flight Inspection
– Verify approaches
– Verify signal strength, coverage volume
• FCC License
– Assigns broadcast frequency, power, time slots
• Verify Installation
– Verify accuracy, availability, stability
– Complete SmartPath acceptance checklist(s)
• Operation & Maintenance
– Document maintenance procedures
– Configure remote monitoring (read-only)
• Spare Parts & Support Equipment
• Training & Certification
– Maintainers, operators
– Control tower personnel
Dave Jensen/John Howard
11
CAAC New Technology Seminar – GBAS 29-30 October 2009
Honeywell.com
Recap
• FAA/Honeywell System Design Approval (SDA) Included
– 3 Year Development Effort
– HW/SW Design Assurance Rigor
– 10 SW Design Assurance Items
– 6 HW Design Assurance Items
– 23 Formal FAA Audits & Reviews
• FAA Facility Approval Includes
– Flight Inspection
– FCC License
– Verify Installation
– Personnel Training & Certification
– Spare Parts & Equipment
•Questions?
Dave Jensen/John Howard
12
CAAC New Technology Seminar – GBAS 29-30 October 2009
SmartPath™
Dave Jensen, John Howard
Honeywell, Precision Landing Systems
29-30 Oct 2009
CAAC New Technology Seminar - GNSS
SmartPath™ Technical Overview
Honeywell.com
SmartPathTM Technical Overview
• SmartPath CAT-I GBAS
– FAA Certified
– Capabilities
– Architecture, Components
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
空管资料5(12)