• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-17 09:13来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 75-33-00
 ALL  ú ú N01 Page 603 ú Oct 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES /MAINTENANCE MANUAL ////////////////////////
SEE E
SEE G
SEE F
FWD
L-A4447
SEE H
E
HPC Secondary Flow Control System Inspection
Figure 601 (Sheet 3)

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-33-00
 ALL  ú ú N01 Page 604 ú Oct 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
INTERMEDIATE CASE
HPC SECONDARY FLOW CONTROL VALVE RIGHT 2.9
AND IDG AIR/OIL HEAT EXCHANGERBLEED VALVE
VALVE OVERRIDE SOLENOID (REF)
PS3 AIR 
FILTER  FWD 
FWD 
G  VALVE OVERRIDE PRESSURE IDG AIR/OIL HEAT EXCHANGER 
SWITCH (REF) 

VISUAL POSITION 
INDICATOR 
RIGHT HPC SECONDARY 
FLOW CONTROL VALVE 

H
FWD
HPC Secondary Flow Control System Inspection
Figure 601 (Sheet 4)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-33-00
 ALL  ú ú N01 Page 605 ú Dec 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL ////////////////////////
S 046-018-N00
 WARNING: DO THE THRUST REVERSER DEACTIVATION PROCEDURE TO PREVENT THE
_______
 OPERATION OF THE THRUST REVERSER. THE ACCIDENTAL OPERATION OF
 THE THRUST REVERSER CAN CAUSE INJURIES TO PERSONS OR DAMAGE TO
 EQUIPMENT.

 (2)  
Do this procedure: Thrust Reverser Deactivation for Ground
 Maintenance (AMM 78-31-00/201).


 S 016-014-N00

 (3)  
Open the core cowl panels (AMM 71-11-06/201).


 S 016-019-N00
 WARNING: OBEY THE INSTRUCTIONS IN AMM 78-31-00/201 WHEN YOU OPEN THE
_______
 THRUST REVERSERS. IF YOU DO NOT OBEY THE INSTRUCTIONS,
 INJURIES TO PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR.

 (4)  
Open the thrust reversers (AMM 78-31-00/201).

 D.  
Examine the Control System of the HPC Secondary Flow


 S 216-003-N00
 (1)  
Visually examine the control valves for the HPC secondary flow.

 (a)  
Examine the control valves for correct installation.

 (b)  
If there is a loose control valve, tighten or replace the mounting bolt(s).

 (c)  
Examine the control valves for cracks.

 (d)  
If there are cracks found, replace the control valve(s) (AMM 75-33-01/401).

 (e)  
Examine the position of the visual position indicator pins on the control valves.

 (f)  
If the position indicator pin(s) is not fully extended, replace the control valve (AMM 75-33-01/401).


 S 216-004-N00
 (2)  
Visually examine the PS3 air filter (the control valve filter for
 the HPC secondary flow) assemblies for cracks and the correct
 installation.


 (a)  
No cracks are permitted.

 1)  Replace the filter assembly if there is a crack (AMM 75-33-02/401).

 (b)  
If there is a loose filter assembly, replace or tighten the mounting bolt(s).


 S 016-005-N00
 (3)  Remove the No. 7 segment of the fan exit liner (AMM 72-34-03/401) to get access to the control valve and valve solenoid of the turbine vane and blade cooling air.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 75-33-00
 ALL  ú ú N01 Page 606 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
S 216-006-N00
 (4)  Visually examine the control valve and the valve solenoid for the
 turbine vane and blade cooling air.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 大气 AIR 2(89)