 (7)  Do the test of the HPC secondary flow control valve and turbine vane and blade cooling air valve solenoid that is shown in the Power Plant Test Reference Table (AMM 71-00-00/501).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ENGINES WITHOUT PHASE 3 CHANGES ú

 75-33-03
 ú ú N01 Page 407 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
HPC SECONDARY FLOW CONTROL VALVE AND IDG AIR/OIL HEAT EXCHANGER VALVE OVERRIDE
______________________________________________________________________________
 SOLENOID - REMOVAL/INSTALLATION

_______________________________
 1.  General_______
 A.  This procedure is for engines without the Phase 3 changes. For engines
 with the Phase 3 changes, do this procedure: Turbine Vane and Blade
 Cooling Air Valve and IDG Air/Oil Heat Exchanger Valve Override Solenoid
 Removal/Installation (AMM 75-24-15/401).

 B.  This procedure gives the instructions for the removal and the
 installation of the override solenoid for the HPC secondary flow control
 valve and the IDG air/oil heat exchanger valve. The override solenoid
 for the HPC secondary flow control valve and the IDG air/oil heat
 exchanger valve will be referred to as the override solenoid for this
 procedure.

 C.  The override solenoid is installed on the aft face of the intermediate
 case at the 1 o'clock position.

 D.  You can get access to the override solenoid through the right thrust
 reverser.

 TASK 75-33-04-004-001-N00
 2.  Remove the HPC Secondary Flow Control Valve and IDG Air/Oil Heat Exchanger__________________________________________________________________________ Valve Override Solenoid (Fig. 401)_______________________
 A.  References
 (1)  
AMM 71-11-04/201, Fan Cowl Panels

 (2)  
AMM 71-11-06/201, Core Cowl Panels

 (3)  
AMM 72-34-03/401, Fan Exit Liner Segment

 (4)  
AMM 78-31-00/201, Thrust Reverser System

 B.  
Access

 (1)  
Location Zone
 412 Engine 1 - Intermediate Case Aft Face 1 o'clock
 422 Engine 2 - Intermediate Case Aft Face 1 o'clock
 432 Engine 3 - Intermediate Case Aft Face 1 o'clock
 442 Engine 4 - Intermediate Case Aft Face 1 o'clock


 (2)  
Access Panel
 416 Right Thrust Reverser Half - Engine 1
 426 Right Thrust Reverser Half - Engine 2
 436 Right Thrust Reverser Half - Engine 3
 446 Right Thrust Reverser Half - Engine 4


 C.  
Prepare to Remove the Override Solenoid


 S 864-002-N00
 (1)  For the applicable engine, open this circuit breaker and install the DO-NOT-CLOSE tag:
 (a)  P6 Main Power Distribution Panel
 1) 6F15 ENG 1 PERF SOL PWR A/APU ENG START

 or ENG 1 PERF SOL PWR A
 2) 6F16 ENG 1 PERF SOL PWR B
 3) 6E15 ENG 2 PERF SOL PWR A
 4) 6E16 ENG 2 PERF SOL PWR B

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ENGINES WITHOUT PHASE 3 CHANGES ú

 75-33-04
 ú ú N03 Page 401 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES /MAINTENANCE MANUAL ////////////////////////
HPC SECONDARY FLOW CONTROL VALVE AND IDG AIR/OIL HEAT EXCHANGER VALVE OVERRIDE SOLENOID INTERMEDIATE
SEE B
CASE
FAN EXIT LINER SEGMENT
SEE A
BOLT PRESSURE(2 PLACES) SWITCH TUBE
IDG AIR/OIL  FWD 
HEAT EXCHANGER 
CAP  VALVE OVERRIDE 
ADAPTER  PRESSURE SWITCH 
ADAPTER 
GASKET  GASKET  A 

IDG AIR/OIL HEAT EXCHANGER BOLT
EEC VALVE OVERRIDEELECTRICAL LOOP PRESSURE SWITCHCONNECTOR CLAMP BRACKET
SOLENOID HOUSINGS BOLT GASKET PLUG
HPC SECONDARY FLOW
GASKET CONTROL VALVE AND
ADAPTER IDG AIR/OIL HEAT EXCHANGER VALVE OVERRIDE SOLENOID
GASKET  EEC ELECTRICAL CONNECTORADAPTERSUPPLY TUBE
AIR SIGNAL TUBE
B
HPC Secondary Flow Control Valve and IDG Air/Oil Heat Exchanger
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 大气 AIR 2(104)