EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
75-31-00
ALL ú ú N01 Page 526 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
i) With the rod end bearing correctly installed, tighten the jamnuts at each rod end to 115-150 pound-inches (13.0-17.0 newton-meters).
j) Install the four rig pins for the unison ring.
k) If you cannot install one of the rig pins, then adjust the unison ring again.
l) If you can install all the rig pins, then remove all the rig pins and the PWA 86344 holder from the unison rings and the bellcrank.
m) Bend one set of tabs on the rod end bearing. n) Bend the other set of tabs on the jamnut. o) Install the lockwire and seal.
G. Put the Aircraft Back to Its Usual Condition.
S 215-132-N00
(1) Do an inspection of the position indication for the variable stator vane actuator (SVA) (AMM 75-31-00/601).
S 415-088-N00
WARNING: OBEY THE INSTRUCTIONS IN AMM 78-31-00 WHEN YOU CLOSE THE THRUST
_______ REVERSERS. IF YOU DO NOT OBEY THE INSTRUCTIONS, INJURIES TO PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR.
(2)
Close the right thrust reverser (AMM 78-31-00/201).
S 415-068-N00
(3)
Close the right core cowl panel (AMM 71-11-06/201).
S 415-069-N00
(4)
Close the right fan cowl panel (AMM 71-11-04/201).
S 445-070-N00
(5)
Do the activation procedure for the thrust reverser
(AMM 78-31-00/201).
S 715-046-N00
(6)
Do the test for the variable stator vane actuator (SVA) that is shown in the Power Plant Test Reference Table (AMM 71-00-00/501).
TASK 75-31-00-825-133-N00
4. Variable Stator Vane Actuator Adjustment (Hydraulic Procedure)________________________________________
A. Special Tools and Equipment
(1) PWA 29451 Adapter - Pratt & Whitney, Commercial
Products Division, 400 Main
Street, East Hartfold,
Connecticut 06108
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
75-31-00
ALL ú ú N01 Page 527 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES /MAINTENANCE MANUAL ////////////////////////
INTERMEDIATE CASE
UNISON RING
DRIVE LINKAGE
SEE A
BELLCRANK
SEE B
ACTUATOR FOR THE
FWD VARIABLE STATOR
VANES
A
POSITIONING
SLOT
BELLCRANK
ARM
SUPPORT
BRACKET
PWA 86097 RIG PIN
ACTUATOR FOR THE
VARIABLE STATOR VANES
SEE C
FWD
B
L-A3219
Variable Stator Vane Actuator Rigging
Figure 503 (Sheet 1)