(b)
Loosen the screws (80) and move the guide fittings (82) (86) to get the correct clearances C1 and C2.
(c)
Make sure that the eccentric washers (88):
-fully seal the holes of the guide fittings (82) and (86),
-
are not above the rounded areas or spot-facing edges,
-
are not out of the outer contour of the fitting.
(d)
Temporarily tighten the screws (80).
(4)
With the door in the down position, make sure that:
(a)
The rollers (81) of the guide fittings (82) and (86) turn freely.
(b)
The clearance C3 is 0.2 mm (0.0078 in.) minimum.
(c)
The clearance C4 is 0.2 mm (0.0078 in.) to 1.5 mm (0.0590 in.).
(d)
The clearance C5 is 3 mm (0.1181 in.) to 8 mm (0.3149 in.).
(e)
If the clearances C3 and C4 are not in the tolerances, adjust the upper and lower guide fittings (82), (86).
(5)
Tighten the screws (80).
(6)
Open the door.
(7)
Put the two shims (thickness 0.2 mm (0.0078 in)) in position in the upper guide fittings (82).
R 1EFF : 062-099, 105-149, 151-199, 204-299, 1 52-13-11Page 446 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
(8)
Close the door, and measure the dimension between the shim and the
roller (81).
(9)
Open the door, remove the nuts (84), the bolts (85) and the shims.
(10)
Adjust the thickness of the washer (83) until the roller (81) touches the shim when the door is closed.
(11)
Install the washer (83), the bolt (85) and the nuts (84), tighten them.
(12)
Install the two shims in the upper sliders (82).
(13)
Close the door. (Ref. Fig. 403/TASK 52-13-11-991-005, 412/TASK 52-13-11-991-017)
(14)
Make sure that there is no stress on the screw (60) of the upper connection link (59) when installed in its hole.
(15)
If there is stress on the screw, modify the radius R of the upper connection link (54) as follows:
(a)
Disconnect the connection links (59) from each side of the yoke (54).
(b)
Remove the nuts (57), the washers (58), (61) and the bolts (60) and the washers (62).
(c)
Disengage the support arm (63) from the upper connection link.
(d)
Loosen the end of the upper connection link (59).
(e)
Adjust the thickness of the set of washers (64) on the upper connection link (59) to modify the radius R of the upper connection link (59).
(f)
Tighten the end of the upper connection link (59) and install the washers (62).
(g)
Install the support arm (63) on the upper and lower connection links (59).
(h)
Install the washers (61) and the bolts (60).
(i)
Install the washers (57) and the nuts (58).
R 1EFF : 062-099, 105-149, 151-199, 204-299, 1 52-13-11Page 447 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
(j) TORQUE the nuts (57) to between 1.2 and 1.35 m.daN (106.19 and
119.46 lbf.in).
**ON A/C 001-049, 051-099, 101-105, 151-154, 201-207,
Subtask 52-13-11-820-055
F. Adjustment of the Upper Hook
(Ref. Fig. 409/TASK 52-13-11-991-019)
(1)
Open the door.
(2)
Make sure that the two shims are position in the upper fittings on the door frame.
(3)
Close the door and adjust the locking hook (122) as follows:
(a)
Turn the barrel of the rod (125) until you get the contact between the locking hook (122) and the roller (121).
(b)
Tighten the nut (123) and the clamp (126).
(c)
Make sure that the lockwashers (124) are correctly positioned.
(d)
Safety the nuts (123) and the lockwashers (124) with MISCELLANEOUS (Material No. 19-010).
(4)
Remove the two shims from the upper sliders (82) and the positioning templates from the frame.
(5)
Make sure that, when the door is closed, the roller (121) turns freely.
R **ON A/C 106-149, 155-199, 208-299, 301-399, 401-499,
Subtask 52-13-11-820-055-A
F. Adjustment of the Upper Hook
(Ref. Fig. 409A/TASK 52-13-11-991-019-A)
(1)
Open the door.
(2)
Make sure that the two shims are in position in the upper fittings on the door frame.