(5)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
1EFF : ALL 1 52-11-31Page 452 1 1 Aug 01/05 1 1 1CES 1 Subtask 52-11-31-865-062
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU EIS/SLIDES/ARM AND WARN/FLT 15WN P11 121VU EIS/SLIDES/ARM AND WARN/GND 13WN P10 121VU EIS/SDAC1 AND 2/DOOR/DET/PAX 48WV P05
4. Procedure
_________ R **ON A/C 001-049, 051-056,
Subtask 52-11-31-420-060
A. Installation of the Roller and Proximity Switch Mechanism
(Ref. Fig. 412/TASK 52-11-31-991-015)
NOTE : Apply a thin layer of COMMON GREASE (Material No. 04-001) to the
____
bushes (5) and (18) and the roller (11).
(1)
Install the rivet (7) the trunnion (21) and the spring (20) on the lever (6).
(2)
Put in position the pin (2) and the washer (3).
(3)
Safety the pin (2) with a new pin cotter (1).
(4)
Install the bolt (23) and the washer (22) on the bellcrank (30).
(5)
Put in position the spring (29) and the bellcrank (30).
(6)
Put in position the spacer (19).
(7)
Install the shouldered bushes (5) and (18) and the lever (6).
(8)
Install the bolt (16), the washer (17) and the nut (4). Tighten the nut (4).
(9)
Put in position the roller (11), the washers (10) and (12) and the spacer (13).
1EFF : ALL 1 52-11-31Page 453 1 1 May 01/05 1 1 1CES 1
(10)
Install the washer (9), the bolt (8) and the nut (14). Do not tighten
the nut (14).
(11)
Install the fitting (27) and the proximity switch (26).
(12)
Install the two washers (25), the two bolts (24) and the two nuts (28). Tighten the two nuts (28).
(13)
Remove the blanking caps from the electrical connectors.
(14) Connect the electrical connector to the proximity switch (26). R **ON A/C 057-099, 101-149, 151-199, 201-299, 301-399, 401-499,
Subtask 52-11-31-420-060-A
A. Installation of the Roller and Proximity Switch Mechanism
(Ref. Fig. 412A/TASK 52-11-31-991-015-A)
NOTE : Apply a thin layer of COMMON GREASE (Material No. 04-001) to the
____
bushes (5) and (18) and the roller (11).
(1)
Install the rivet (7) the trunnion (21) and the spring (20) on the lever (6).
(2)
Put in position the pin (2) and the washer (3).
(3)
Safety the pin (2) with a new pin cotter (1).
(4)
Install the bolt (23) and the washer (22) on the bellcrank (30).
(5)
Put in position the spring (29) and the bellcrank (30).
(6)
Put in position the spacer (19).
(7)
Install the shouldered bushes (5) and (18) and the lever (6).
(8)
Install the bolt (16), the washer (17) and the nut (4). Tighten the nut (4).
(9)
Put in position the roller (11) and the eccentric yoke (12).
(10)
Put in position the bushes (13) and (9) and the washer (10).
(11)
Install the nut (14) and the bolt (8). Do not tighten the nut (14).
1EFF : ALL 1 52-11-31Page 454 1 1 Aug 01/05 1 1 1CES 1
(12)
Install the fitting (27) and the proximity switch (26).
(13)
Install the two washers (25), the two bolts (24) and the two nuts (28). Tighten the two nuts (28).
(14)
Remove the blanking caps from the electrical connectors.
(15) Connect the electrical connector to the proximity switch (26).
**ON A/C ALL
Subtask 52-11-31-710-050
B. Adjustment of the Proximity Switch 11WV1 (11WV2)
(1) Adjust the proximity switch 11WV1 (11WV2) of the locking hook of the passenger/crew doors (Ref. TASK 52-71-00-820-001).
(2) Tighten the nut (14). Safety the nut (14) with a new cotter pin (15). R **ON A/C 001-049, 051-056,
Subtask 52-11-31-210-053
C. Adjustment of the Upper Hook
(Ref. Fig. 413/TASK 52-11-31-991-016)
(1)
Open the door.
(2)
Make sure that the two shims are in position in the upper fittings on the door frame.
(3)
Close the door and adjust the locking hook (31) as follows: