• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 23:42来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (m)
 Make sure that the lockwashers (6) are correctly positioned.

 (n)
 Safety the nuts (5) and the lockwashers (6) with MISCELLANEOUS (Material No. 19-010).


 (7) Open the door and remove the shims located between the upper fittings
 (1) and the rollers (2).
R 1EFF : 057-099, 101-149, 151-199, 201-299, 1 52-11-21Page 510 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1R **ON A/C ALL


 Subtask 52-11-21-820-050
 B. Adjustment of the Safety Pin R (Ref. Fig. 503/TASK 52-11-21-991-002)
 (1)
 Close the door

 (2)
 Make sure that the clearance J1 between the safety pin (23) and the frame fitting (20) is 4 -1 +1 mm (0.1574 -0.0393 +0.0393 in.).

 (3)
 If the clearance J1 is not in the tolerance, adjust as follows:

 (a)
 Open the door.

 (b)
 Remove the screw (21) and the adjustable washer (22).

 (c)
 Put a new adjustable washer (22) to get the correct clearance J1.

 (d)
 Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-007A) on the threads of the screw (21).

 (e)
 Install the screw (21).

 (f)
 TORQUE the screw (21) to between 0.6 and 0.7 m.daN (53.09 and

 


 61.94 lbf.in).
 Subtask 52-11-21-820-054

 C. Adjustment of the Proximity Switch of the Locking Hook
 (1) Do an adjustment of the proximity switches (11WV1 or 11WV2) (Ref. TASK 52-71-00-820-001).
 1EFF : ALL 1 52-11-21Page 511 1 1 Nov 01/98 1 1 1CES 1


R  Safety Pin Adjustment Figure 503/TASK 52-11-21-991-002
 1EFF : 1 1 1CES  ALL  1 111 52-11-21 Page 512 Nov 01/98

 

 5. Close-up
________ Subtask 52-11-21-410-051
 A. Install of Components
 (1)
 Install the door insulation.

 (2)
 Install the door lining panels (Ref. TASK 25-23-46-400-001).

 (a)
 For the left passenger/crew door 831 831EZ.

 (b)
 For the right passenger/crew door 841 841EZ.

 


 (3) Install the lining flap (Ref. TASK 52-11-31-400-001). Subtask 52-11-21-865-052
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 13WN, 15WN, 48WV.
 Subtask 52-11-21-410-050
 C. Close Access
 (1)
 Obey the special precautions after the work on the door (Ref. TASK 52-10-00-860-002).

 (2)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 (3)
 Close the applicable passenger/crew door 831 or 841 (Ref. TASK 52-10-00-410-001).

 (4)
 Remove the access platform(s).

 (5)
 Make sure that the work area is clean and clear of tool(s) and other items.


 1EFF : ALL 1 52-11-21Page 513 1 1 Nov 01/98 1 1 1CES 1 MECHANISM - DOOR LOCKING - INSPECTION/CHECK


___________________________________________
 TASK 52-11-21-220-001
 Detailed Visual Inspection of the Door Locking Mechanism
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific access platform 3.50 m (11 ft. 6 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 52-10-00-010-001 Opening of the Passenger/Crew Door 52-10-00-410-001 Closing of the Passenger/Crew Door 52-10-00-860-001 Special Precautions before Work on the Passenger/Crew
 Door 52-10-00-860-002 Special Precautions after Work on the Passenger/Crew
 Door 52-10-00-915-001 Replacement of the Bushes 52-11-21-000-001 Removal of the Door Locking Mechanism 52-11-21-400-001 Installation of the Door Locking Mechanism 52-11-21-991-024 Fig. 601 52-11-21-991-025 Fig. 602 52-11-21-991-026 Fig. 603 52-11-21-991-027 Fig. 604 52-11-21-991-028 Fig. 605 52-11-21-991-029 Fig. 606 52-11-21-991-030 Fig. 607
 1EFF : ALL 1 52-11-21Page 601 1 1 Feb 01/98 1 1 1CES 1


 3. Job Set-up
__________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门2(12)