1EFF : ALL 1 52-10-00Page 226 1 1 Feb 01/02 1 1 1CES 1 1EFF : 001-002, 1 52-10-00Page 227 1 1 Feb 01/02 1 1 1CES 1
R 1_ Lift the base plate (2) with the weight fitting (1) on to the
R supports (12).
R NOTE : Two persons are necessary for this step, one on each____
R side of the base plate (2). The base plate (2) with the
R weight fitting (1) weighs 23 kg (50.705 lb).
R 2_ Install the pins (4) and tighten them.
R a_ For the aft doors: on the upper holes in the upper corners
R of the base plate.
R b_ For the forward doors: on the lower holes in the upper
R corners of the base plate.
R (b) Install the weight assy with the weight N2 as follows:
R (Ref. Fig. 205/TASK 52-10-00-991-049)
R 1_ Install the weight N2 (5) in position on the center of the
R center slot against the front edge of the weight fitting (1).
R 2_ Install the pin (6) through the weight N2 (5) and the weight
R fitting (1).
R NOTE : Make sure that the stud (7) is fully engaged in the____
R slot of the weight N2 (5).
R 3_ Install the nut (3) and tighten it.
R **ON A/C 003-049, 051-099, 101-149, 151-199, 201-299, 301-399, 401-499,
TASK 52-10-00-480-001-A
Installation of the Passenger/Crew Door Ballast Weight (98D52103501000) for Escape Slide/Raft
1. Reason for the Job
__________________
This procedure tells how to install the ballast weight set to 60 kg (132.277 lb) which is equal to the weight of the escape slide/raft, the door linings and the door insulation.
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3.5 m (11 ft. 6 in.) 98D52103501000 1 BALLAST WEIGHT - PASSENGER CREW DOOR
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-10-00-860-001 Special Precautions before Work on the Passenger/Crew
Door 52-10-00-991-049-A Fig. 205A 52-10-00-991-050 Fig. 206
3. Job Set-up
__________ Subtask 52-10-00-860-057
A. Aircraft Maintenance Configuration
(1)
Make sure that the access platform is in position at the zone 831 or 841 or 832 or 842.
(2)
Obey the special precautions before you start work on the door (Ref. TASK 52-10-00-860-001).
R 1EFF : 003-049, 051-099, 101-149, 151-199, 1 52-10-00Page 228 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 52-10-00-865-088
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU EIS/SLIDES/ARM AND WARN/FLT 15WN P11 121VU EIS/SLIDES/ARM AND WARN/GND 13WN P10 121VU EIS/SDAC1 AND 2/DOOR/DET/PAX 48WV P05
Subtask 52-10-00-210-084