Release of the Compensation Mechanism Figure 401/TASK 52-11-21-991-012
1EFF : 1 1R 1CES ALL 1 11 1 52-11-21 Page 406 Feb 01/02
Outer Control Handle Figure 402/TASK 52-11-21-991-008
1EFF : 1 1R 1CES ALL 1 11 1 52-11-21 Page 407 May 01/98
Plate Assembly Figure 403/TASK 52-11-21-991-011
1EFF : 1 1R 1CES ALL 1 11 1 52-11-21 Page 408 May 01/98
Subtask 52-11-21-020-052
C. Removal of the Inner Control Handle
(Ref. Fig. 404/TASK 52-11-21-991-007)
(1)
Remove the cotter pin (171) and discard it.
(2)
Remove the nut (172) and the washer (170).
(3) Remove the inner control handle (173). Subtask 52-11-21-020-053
D. Removal of the Gearbox
(Ref. Fig. 405/TASK 52-11-21-991-009)
(1)
Removal of the plate assy
(Ref. Fig. 403/TASK 52-11-21-991-011)
(a)
Remove the screws (182) (184) and the washers (183).
(b)
Remove the plate assy (181).
(c)
Clean the contact surface with CLEANING AGENTS (Material No. 11-004) and MISCELLANEOUS (Material No. 19-003).
(2)
Remove the inner and the outer control handles (222) and (238).
(3)
Remove the cotter pins (205) and discard them.
(4)
Remove the nuts (204), the washers (203) the bolts (210) and the washers (209).
(5)
Disengage the rods (207) and (223).
(6)
Remove the bushes (232) (233) (234) and (235).
(7)
Remove the cotter pin (220) and discard it.
(8)
Remove the nut (219), the washer (218) and the bolt (216).
(9)
Disengage the rod (217).
(10)
Remove the spacer (236).
(11)
Remove the spacer (231).
1EFF : ALL 1 52-11-21Page 409 1 1 Feb 01/02R 1 1 1CES 1
Inner Control Handle Figure 404/TASK 52-11-21-991-007
1EFF : 1 1R 1CES ALL 1 11 1 52-11-21 Page 410 Feb 01/02
Gearbox Figure 405/TASK 52-11-21-991-009
1EFF : 1 1R 1CES ALL 1 11 1 52-11-21 Page 411 Feb 01/02
(12)
Remove the nut (230) and the bolts (221).
(13)
Remove the stop (229).
(14)
Remove the washers and the set of washers (202) and (228).
(15)
Remove the spacers (227) and (226).
(16)
Remove the nuts (211) and the bolts (213).
(17)
Remove the bearing (212).
(18)
Remove the gearbox assembly (214).
(19) Remove the sealant from the contact surface of the bearing (212). Subtask 52-11-21-020-054
E. Remove the Lowering Shaft
(Ref. Fig. 406/TASK 52-11-21-991-006)
(1)
Open the door.
(2)
Remove the cotter pin (71) and discard it.
(3)
Remove the nut (72) and the washer (73) and the bolt (81) and disconnect the rod (74) from the lever assy (75) and remove the spacer (70).
(4)
Remove the nut (77) and the bolt (76).
(5)
Remove the lever assembly (75).
(6)
Remove the nuts (78), the bolts (80) and the bearing (79).
(7)
Remove the nut (85) and the bolt (87).
(8)
Remove the lever (86) from the lowering shaft (82).
(9)
Remove the nuts (88) and the bolts (83).
(10)
Remove the plate (84).
(11)
Remove the lowering shaft (82) from the door structure.
1EFF : ALL 1 52-11-21Page 412 1 1 Feb 01/02R 1 1 1CES 1
Lowering Shaft Figure 406/TASK 52-11-21-991-006
1EFF : 1 1R 1CES ALL 1 11 1 52-11-21 Page 413 May 01/98
(12) Remove the sealant from the contact surface of the plate (86) with CLEANING AGENTS (Material No. 11-004) and MISCELLANEOUS (Material No. 19-003).
Subtask 52-11-21-020-056
F. Removal of the Safety Pin and the Locking Hook (Ref. Fig. 407/TASK 52-11-21-991-013)
(1)
Open the door.
(2)
Remove the lining flap (Ref. TASK 52-11-31-000-001).
(3)
Removal of the locking hook (2).
(a)
Disconnect the rod (23).
(b)
Disconnect the rod (48). 1 Release the rod (48) as follows:
1_ Remove the cotter pin (20) and discard it.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门1(168)