52-CONTENTS Page 55 Aug 01/05 R CES
CHAPTER 52
__________
DOORS
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ LANDING GEAR 52-80-00
____________ DESCRIPTION AND OPERATION 1 ALL General 1 ALL
MAIN GEAR DOORS 52-81-00 DESCRIPTION AND OPERATION 1 ALL General. 1 ALL Component Location 1 ALL MLG Main Door Assembly 1 001-049, 051-099 101-149, 151-199 201-299, 401-499 MLG Hinged Fairing Assembly 6 001-049, 051-099 101-149, 151-199 201-299, 401-499 MLG Fixed Fairing Assembly 6 001-049, 051-099 101-149, 151-199 201-299, 401-499 MLG Main Door Assembly 6 301-399, MLG Hinged Fairing Assembly 7 301-399, MLG Fixed Fairing Assembly 7 301-399, System Description 7 ALL MLG Main Door 7 ALL MLG Hinged Fairings 7 ALL MLG Fixed Fairing 8 ALL
MAIN GEAR DOORS 52-81-00
INSPECTION/CHECK 601 ALL
Detailed Visual Inspection of Main 601 ALL
Landing Gear Door Forward and Aft
Fitting
Detailed Inspection of the MLG 606 ALL
Door Fittings
DOOR - MAIN LANDING GEAR, COMMON RAMP 52-81-18
REPAIRS 801 ALL
Main Landing-Gear Door -801 ALL
Replacement of the Central-Ramp
Teflon Strip
NOSE GEAR DOORS 52-82-00 DESCRIPTION AND OPERATION 1 ALL General 1 ALL Description 1 ALL Main Forward Doors 1 ALL Aft Doors 1 ALL Leg Door 1 ALL
52-CONTENTS Page 56 Aug 01/05 R CES
CHAPTER 52
__________
DOORS
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________
Operation 1 ALL The forward and aft doors open 1 ALL out around axis XX'. The forward doors are normally 1 ALL in the closed position. The aft doors are operated by an 4 ALL adjustable rod connected to the gear leg. They are open when the gear is extended. The leg door is secured to 3 4 ALL points on the rear of the gear leg. It provides a space for the drag strut assembly when the gear is extended.
NOSE GEAR DOORS 52-82-00
INSPECTION/CHECK 601 ALL Detailed Inspection of NLG, Main 601 ALL Door Hinges, LH/RH Detailed Inspection of NLG, 606 ALL Secondary Doors Hinges, LH/RH
MISCELLANEOUS DOORS (RAT...) 52-90-00
____________________________ DESCRIPTION AND OPERATION 1 ALL General 1 ALL
DOORS - RAM AIR TURBINE 52-91-00
DESCRIPTION AND OPERATION 1 ALL General 1 ALL Component Description 1 ALL Operation 1 ALL
DOOR - RAM AIR TURBINE 52-91-11
REMOVAL/INSTALLATION 401 ALL Removal of the Ram Air Turbine 401 ALL (RAT) Door 195CB Installation of the Ram Air 408 ALL Turbine (RAT) Door 195CB
DOOR - OVERPRESSURE RELEASE, APU 52-92-00 COMPARTMENT
DESCRIPTION AND OPERATION 1 ALL General 1 ALL Component Description 1 ALL Operation 1 ALL
52-CONTENTS Page 57 Aug 01/05 R CES
CHAPTER 52
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门1(63)