• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:12来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -put a warning notice to tell persons not to energize the FADEC 1(2).
 Subtask 36-11-43-865-058
 C. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR BLEED/ENG 1/CTL 3HA1 D12 49VU AIR BLEED/ENG 1/MONG 2HA1 D11 122VU AIR BLEED/ENG 2/CTL 3HA2 Z23 122VU AIR BLEED/ENG 2/MONG 2HA2 Z22
 Subtask 36-11-43-010-054
 D. Get Access
 (1)
 Put the access platform in position below the engine.

 (2)
 Open the access door:
 FOR 7170HM1
 413DL
 FOR 7170HM2
 423DL

 


R **ON A/C 001-049, 056-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 4. Procedure
_________
R **ON A/C 001-049, 056-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 Post SB 36-1038 For A/C 001-004,
 Subtask 36-11-43-020-054
 A. Removal of the Thermostat-Filter of the Fan Air Valve-Control
 (Ref. Fig. 402/TASK 36-11-43-991-003)

 (1)
 Remove and discard the lockwire from the filter (4).

 (2)
 Loosen and remove the filter (4).


R 1EFF : 001-049, 056-099, 101-149, 151-199, 1 36-11-43Page 416 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 Thermostat Filter
 Figure 402/TASK 36-11-43-991-003

R 1EFF : 001-049, 056-099, 101-149, 151-199, 1 36-11-43Page 417 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 (3)
 If the filter is dirty, clean the filter (Ref. TASK 36-11-43-100-001), or replace it with a new or a clean filter (Ref. TASK 36-11-43-000-003) and (Ref. TASK 36-11-43-400-003).

 (4)
 Remove and discard the seal (2).

 (5)
 Put a blanking plug on the opening of the thermostat (3).


R 1EFF : 001-049, 056-099, 101-149, 151-199, 1 36-11-43Page 418 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1

 

R **ON A/C 001-049, 056-099, 101-149, 151-199, 201-299, 301-399, 401-499,

 TASK 36-11-43-400-003
 Installation of the Thermostat-Filter of the Fan Air Valve-Control
 WARNING : MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START
_______
 WORK ON THE PNEUMATIC SYSTEM.

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plug
 No specific warning notice
 No specific access platform 2 m (6 ft. 7 in.)
 No specific Torque Wrench : range 0.20 to 3.60 m.daN

 (2.00 to 26.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R Material No. 04-034 USA MIL-A-907 D
R ANTI-SEIZE LUBRICANT ,REGULAR GRADE (Ref. 20-31-00)

 Material No. 19-009  USA AMS 5687
 LOCKWIRE STAINLESS STEEL ANNEALED 0.5MM DIA
 (Ref. 20-31-00)

R 1EFF : 001-049, 056-099, 101-149, 151-199, 1 36-11-43Page 419 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 C. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION  |IPC-CSN
 -------------------------------------------------------------------------------
2 seal 36-11-43 01D-060 4 filter 36-11-43 01D-050
 D. Referenced Information -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power R **ON A/C 001-049, 056-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 36-1038 For A/C 001-004, 36-11-43-991-003 Fig. 402 R **ON A/C 001-049, 056-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 3. Job Set-up
__________
R  **ON A/C 001-049, 056-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 36-1038 For A/C 001-004, Subtask 36-11-43-860-052
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PNEUMATIC 气源 1(94)