APU BLEED AIR SUPPLY AND CROSSBLEED 36-12-00
SYSTEMS
ADJUSTMENT/TEST 501 ALL
Operational Test of the APU Bleed 501 ALL
Air Supply and Crossbleed Systems
Operational Check of Crossbleed 508 ALL
Valve in Manual Mode
Leak Test of the APU Bleed-Air 511 ALL
36-CONTENTS Page 9 Aug 01/05 R CES
CHAPTER 36
__________
PNEUMATIC
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Supply-System Leak Check on APU Bleed Air 528 001-049, 051-099 Ducting (Upstream the APU Bleed 101-105, 151-199 Check Valve) 201-210, Leak Check on Bleed Air Ducting in 538 001-049, 051-099 the Fuselage Area between the APU 101-105, 151-199 Bleed Check Valve, Air 201-210, Conditioning Pack and Wing/Fuselage Connection
SPRING ROD 36-12-11
REMOVAL/INSTALLATION 401 ALL
Removal of the Spring Rods (FR65, 401 ALL
FR68, FR72 and FR74)
Installation of the Spring Rods 405 ALL
(FR65, FR68, FR72 and FR74)
DUCT - APU AND CROSSBLEED AIR SUPPLY 36-12-41
SYSTEM
REMOVAL/INSTALLATION 401 ALL
Removal of a Bleed-Air Duct 401 ALL
Installation of a Bleed-Air Duct 412 ALL
Replacement of the Combo Seals on 425 ALL
the Pack Inlet including on the
Sleeves downstream and upstream of
the FCV
BELLOWS, FR 70 TO FR71 36-12-42
REMOVAL/INSTALLATION 401 ALL
Removal of the Bellows (7265HM) 401 ALL
Installation of the Bellows 405 ALL
(7265HM)
VALVE - APU BLEED CHECK 36-12-51
REMOVAL/INSTALLATION 401 ALL
Removal of the Check Valve 401 ALL
Installation of the Check Valve 405 ALL
Removal of the APU Bleed 409 ALL
Check-Valve (7260HM)
Installation of the APU Bleed 413 ALL
Check-Valve (7260HM)
VALVE - APU BLEED CHECK 36-12-51
INSPECTION/CHECK 601 ALL
Inspection of the APU Bleed 601 ALL
Check-Valve (7260HM)
VALVE - CROSSBLEED 36-12-52
REMOVAL/INSTALLATION 401 ALL
Removal of the Crossbleed Valve 401 ALL
(6HV)
Installation of the Crossbleed 405 ALL
36-CONTENTS Page 10 Aug 01/05 R CES
CHAPTER 36
__________
PNEUMATIC
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________ Valve (6HV) Removal of the Crossbleed Valve 408 ALL Actuator Installation of the Crossbleed 411 ALL Valve Actuator
VALVE - CROSSBLEED 36-12-52
INSPECTION/CHECK 601 ALL Inspection of the Crossbleed Valve 601 ALL (6HV)
GROUND COMPRESSED AIR SUPPLY SYSTEM 36-13-00 DESCRIPTION AND OPERATION 1 ALL General 1 ALL Component Location 1 ALL System Description 1 ALL Component Description 1 ALL Operation 4 ALL Test 4 ALL GROUND CONNECTOR - HP 36-13-41 REMOVAL/INSTALLATION 401 ALL Removal of the HP Ground Connector 401 ALL (7300HM) Installation of the HP Ground 406 ALL Connector (7300HM)
ENVIRONMENT PROTECTION 36-14-00 DESCRIPTION AND OPERATION 1 ALL General 1 ALL Protection of the Wing Leading 1 ALL Edge, the Pylon and the Nacelles Component Location 1 ALL Ventilation of the Wing Leading 1 ALL Edge Protection of Wing Leading Edge 2 ALL Protection of the Pylons 2 ALL Protection of the Nacelle 2 ALL System Description 7 ALL Ventilation of the Wing Leading 7 ALL Edge Protection of the Wing Leading 7 ALL Edge Protection of the Pylon 9 ALL Protection of the Nacelles 9 ALL Component Description 9 ALL Ventilation of the Leading Edge 9 ALL Protection of the Wing Leading 10 ALL
36-CONTENTS Page 11 Aug 01/05 R CES
CHAPTER 36
__________
PNEUMATIC
TABLE OF CONTENTS_________________
SUBJECT CH/SE/SU_______ ________ C_ PAGE EFFECTIVITY____ ___________
Edge
Protection of the Pylon 10 ALL
Protection of the Nacelles 12 ALL
Operation/Control and Indicating 12 ALL
Ventilation of the Wing Leading 12 ALL
Edge
Protection of the Wing Leading 13 ALL
Edge
Protection of the Pylons 13 ALL
Protection of the Nacelles 13 ALL
INDICATING 36-20-00__________
DESCRIPTION AND OPERATION 1 ALL
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PNEUMATIC 气源 1(16)