Subtask 36-11-49-410-052
R C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Close the thrust reverser cowl doors (Ref. TASK 78-36-00-410-040): FOR 1000EM1 451AL, 452AR FOR 1000EM2 461AL, 462AR
(3) Remove the access platform(s).
Subtask 36-11-49-440-061
R D. Make the thrust reverser serviceable (Ref. TASK 78-30-00-081-041).
Subtask 36-11-49-410-084
R E. Close Access
(1) Close the fan cowl doors (Ref. TASK 71-13-00-410-040): FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR
(2) Remove the warning notice(s).
Subtask 36-11-49-862-057
R F. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
TASK 36-11-49-000-045
Removal of the Lower High Pressure Duct
WARNING : MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START
_______ WORK ON THE PNEUMATIC SYSTEM.
WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______ THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO ONE HOUR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs No specific circuit breaker(s) safety clip(s) No specific protective covers No specific warning notice No specific access platform 0.5 m (1 ft. 8 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power 71-13-00-010-040 Opening of the Fan Cowl Doors 78-30-00-481-041 Make the Thrust Reverser Unserviceable for
Maintenance 78-36-00-010-040 Opening of the Thrust Reverser Doors 36-11-49-991-303 Fig. 404
1EFF : ALL 1 36-11-49Page 436 1 1 Feb 01/01R 1 1 1CES 1
3. Job Set-up
__________
Subtask 36-11-49-861-066
A. Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
Subtask 36-11-49-941-056
B. Safety Precautions
(1)
Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2)
On the AIR COND panel 30VU:
-make sure that the ENG 1(2) BLEED pushbutton switch is released
(the OFF legend is on), R - make sure that the APU BLEED pushbutton switch is released (the ON R legend is off),
-put a warning notice to tell persons not to operate the pneumatic system.
(3)
On the ENG panel 115VU:
-put a warning notice to tell persons not to start the engine 1(2).
(4)
On the HP ground connector:
-Put a warning notice to tell persons not to pressurize the pneumatic system.
(5)
On the ENG section of the maintenance panel 50VU:
-make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton switch is off,
-put a warning notice to tell persons not to energize the FADEC 1(2).
Subtask 36-11-49-865-059
C. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR BLEED/ENG 1/CTL 3HA1 D12 49VU AIR BLEED/ENG 1/MONG 2HA1 D11 122VU AIR BLEED/ENG 2/CTL 3HA2 Z23 122VU AIR BLEED/ENG 2/MONG 2HA2 Z22
Subtask 36-11-49-010-053
D. Get Access
(1)
Open the fan cowl doors (Ref. TASK 71-13-00-010-040):
FOR 1000EM1
437AL, 438AR
FOR 1000EM2
447AL, 448AR
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PNEUMATIC 气源 1(127)