• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:12来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 1EFF : ALL 1 36-11-15Page 504 1 1 Feb 01/03R 1 1 1CES 1


 (2) Do this test:
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the ECAM control panel:
-push the BLEED key.
2.
 On the test set:

- open the shutoff valve of the air cylinder.

3.
 On the test set:

-use the primary regulator to pressurize the pressure source to 100 psi (6.8947 bar)

 4.
 On the test set:

-slowly pressurize the system No. 1 from 10 PSIG to 90 PSIG.

5.
 On the test set:

-depressurize the system No. 1.

6.
 On the test set:

-use the primary regulator to depressurize the pressure source.

 7.
 On the test set:


-close the shutoff valve of the air cylinder.
On the SD:
-
the BLEED page comes into view and shows the bleed pressure.

On the test set:

-
the pressure gage of the air cylindershows the pressure.

On the test set:

-
the primary gage shows 100 PSIG.

On the test set:

-
the pressure gage No. 1 shows thepressure. On the SD:

 -
the BLEED page shows the supplied pressure which must agree with the value of the pressure gage No. 1 plus or minus 2 PSIG.

On the test set:

-
the pressure gage No. 1 shows 0 PSIG.

On the test set:

-
the primary gage shows 0 PSIG.

On the test set:

-
the pressure gage of the air cylindershows 0 PSIG.


 1EFF : ALL 1 36-11-15Page 505 1 1 Feb 01/03R 1 1 1CES 1


 5. Close-up
________ Subtask 36-11-15-942-051-A
 A. Put the aircraft back to its initial configuration.
 (1)
 Disconnect the test set from the bleed transferred
 pressure-transducer.


 (2)
 Remove the blanking plug from the disconnected line end.

 (3)
 Connect the sense line to the bleed transferred pressure-transducer 7HA1(2).

 (4)
 Safety the sense line with MISCELLANEOUS (Material No. 19-018).

 (5)
 Disconnect the cable bundle from the electrical connector 8HA1-A(8HA2-A) and from the bleed transferred pressure-transducer 7HA1(2).

 (6)
 Remove the blanking cap from the electrical connector 7HA1-A(7HA2-A).

 (7)
 Connect the electrical connector 8HA1-A(8HA2-A) to the bleed regulated pressure-transducer 8HA1(2).

 (8)
 Connect the electrical connector 7HA1-A(7HA2-A) to the bleed transferred pressure-transducer 7HA1(2).


 Subtask 36-11-15-740-050
 B. Do the BITE Test of the BMC 1(2) (Ref. TASK 36-11-00-740-001).
 (1) Make sure that these maintenance messages are not shown on the TEST RESULT page:
 CLASS 3 : 36-11-15 TRANSF-PRESS XDCR 7HA1(2)
 CLASS 2 : 36-11-16 REG-PRESS XDCR 8HA1(2)
 1EFF : ALL 1 36-11-15Page 506 1 1 Feb 01/03R 1 1 1CES 1


 Subtask 36-11-15-410-051
 C. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close these access doors :
 FOR 7HA1
 415AL, 415AR
 FOR 7HA2
 425AL, 425AR


 (3)
 Remove the access platform(s).


 (4) Remove the warning notice(s). Subtask 36-11-15-862-051
 D. De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

 

 TRANSDUCER - BLEED REGULATED PRESSURE (8HA1,8HA2) - REMOVAL/INSTALLATION
________________________________________________________________________ TASK 36-11-16-000-001 Removal of the Bleed Regulated Pressure Transducer (8HA1,8HA2) WARNING : MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START
_______ WORK ON THE PNEUMATIC SYSTEM.
 WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______ THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO ONE HOUR.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific blanking plugs No specific circuit breaker(s) safety clip(s) No specific warning notice No specific access platform 3.5 m (11 ft. 6 in.)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PNEUMATIC 气源 1(75)