R 1EFF : 001-049, 101-105, 201-203, 1 36-11-48Page 621 1 1 May 01/05 1 1 1CES 1
R (b) The flexible connectors (3), (4) and (5) on the wing to fuselage
R 'S' duct.
R NOTE : Leakage is permitted when a series of bubbles are____
R continuous on the joint line, and as one bubble breaks
R another one forms. This indicates that the detection
R solution is stable on the joint line. Leakage is not
R permitted, when air pressure blows detection solution from
R the joint line and prevents a continuous series of
R bubbles.
R (10) On the AIR COND panel 30VU, release (out) the APU BLEED P/BSW:
R - make sure that the APU BLEED P/BSW light goes off.
R (11) Stop the APU (Ref. TASK 49-00-00-860-009).
R (12) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
R (13) De-energize the aircraft electrical circuits
R (Ref. TASK 24-41-00-862-002).
R (14) Replace and/or reseal ducts that leak (Ref. TASK 36-11-48-000-004)
R and (Ref. TASK 36-11-48-400-004).
R **ON A/C 001-049, 051-061, 101-105, 201-203,
5. Close-up________
R **ON A/C 001-049, 101-105, 201-203,
Subtask 36-11-48-410-059-A
A. Close Access
(1) Use distilled water to remove remaining any leak detection solution
from the ducting and dry with a MISCELLANEOUS (Material No. 19-003).
(2) Install the insulation muffs on the flexible connectors (1) thru (5).
(3) Use MISCELLANEOUS (Material No. 19-001) to safety the insulation
muffs.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 36-11-48Page 622 1 1 May 01/05 1 1 1CES 1
(5) Install the applicable access panels (Ref. TASK 53-35-11-400-001):
(a) For the LH wing:
- install the access panels 191BT, 521AB, 521BT.
(b) For the RH wing:
- install the access panels 192BT, 621AB, 621BT.
(6) If the GAPC was used:
- close the access door 191DB.
R **ON A/C 051-061,
R Subtask 36-11-48-410-059
R A. Close Access
R (1) Use distilled water to remove remaining leak detection solution from
R the ducting and dry with a MISCELLANEOUS (Material No. 19-003).
R (2) Install the insulation muffs on the flexible connectors (1) thru (5).
R (3) Use MISCELLANEOUS (Material No. 19-001) to safety the insulation
R muffs.
R (4) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (5) Install the applicable access panels (Ref. TASK 53-35-11-400-001):
R (a) For the LH wing:
R - install the access panels 191BT, 521AB, 521BT.
R (b) For the RH wing:
R - install the access panels 192BT, 621AB, 621BT.
R (6) Close the access door 191DB.