• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:12来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2) Do this test:
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------

1. On the ECAM control panel: - push the BLEED key.  On the SD:- the BLEED page comes into view and shows the bleed pressure.
 2. On the test set:  On the test set:
 - open the shutoff valve of the air cylinder.  - the pressure gage of the air cylindershows the pressure.
 3. On the test set:  On the test set: 
R R R  - use the primary regulator to pressurize the pressure source to 100 psi (6.89 bar). - the primary gage shows 100 psi (6.89 bar). 

 

 Test of the Bleed Regulated Pressure Transducer (8HA1, 8HA2)
 Figure 501/TASK 36-11-16-991-002

 

 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
R R R  4. On the test set: - slowly pressurize the system No. 1 from 10 psi (0.69 bar) to 90 psi (6.21 bar). 
R R 
R R  5. On the test set: - depressurize the system No. 1. 
R  6. On the test set: - use the primary regulator to depressurize the pressure source.
R R  7. On the test set: - close the shutoff valve of the air cylinder. 
5. Close-up________
 Subtask 36-11-16-942-051-A

On the test set:
-
the pressure gage No. 1 shows the pressure. On the SD:

 -
the BLEED page shows the supplied pressure which must agree with the value of the pressure gage No. 1 plus or minus 2 psi (0.14 bar).

On the test set:

-
the pressure gage No. 1 shows 0 psi (0 bar).

On the test set:

-
the primary gage shows 0 psi (0 bar).

On the test set:

-
the pressure gage of the air cylinder shows 0 psi (0 bar).


 A. Put the aircraft back to its initial configuration.
 (1)
 Disconnect the test set from the bleed Regulated pressure-transducer.

 (2)
 Remove the blanking plug from the disconnected line end.

 (3)
 Connect the sense line to the bleed Regulated pressure-transducer 8HA1(2).


 (4) Safety the sense line with MISCELLANEOUS (Material No. 19-018). Subtask 36-11-16-860-055
 B. Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).


 Subtask 36-11-16-410-051

 C. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close these access doors :
 FOR 8HA1
 415AL, 415AR
 FOR 8HA2
 425AL, 425AR


 (3)
 Remove the access platform(s).


 (4) Remove the warning notice(s). Subtask 36-11-16-862-052
 D. De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

 

 SENSOR - EXCHANGER OUTLET TEMPERATURE (6HA1,6HA2) - REMOVAL/INSTALLATION
________________________________________________________________________
 TASK 36-11-17-000-001 Removal of the Heat-Exchanger Outlet-Temperature Sensor 6HA1(6HA2) WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific safety barriers
 No specific warning notice(s)
 No specific access platform 2.5 m (8 ft. 2 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
36-11-17-991-001 Fig. 401 3. Job Set-up


__________
 (Ref. Fig. 401/TASK 36-11-17-991-001)
 Subtask 36-11-17-941-050
 A. Safety Precautions
 WARNING : MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM PNEUMATIC 气源 1(79)