曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
forecast satellite outages will not result in a loss of navigation coverage (i.e. the capability to determine
position) on any part of the specified route of flight. If such outages are detected by the programme, the
flight will need to be re-routed, delayed or cancelled.
Determination of the Availability of RAIM
8.3.13 Once the position determination function is assured (i.e. no loss in navigation coverage for
the route has been predicted), the operator must run the RAIM outage prediction programme. Any
continuous outage of RAIM capability of greater than 51 minutes in MNPS airspace means again that the
flight should be re-routed, delayed or cancelled. It is understood that some prediction programmes carry out
both these checks together.
Note - Derivation of the 51 minute limit – At the instant the RAIM capability is lost, it is assumed
that the GPS navigation solution proceeds to direct the aircraft away from track at a speed
of 35 knots. With the current MNPS track spacing of 60 nautical miles, it is further assumed
that aircraft on adjacent tracks have a lateral “safety buffer” of 30 nautical miles. At 35
knots it will take an aircraft 51 minutes to exit this “safety buffer”. It should be noted that
this is a very conservative methodology and it is thought unlikely that a RAIM outage alone
could cause such errant navigation behaviour.
Loading of Initial Waypoints
8.3.14 The manual entry of waypoint data into the navigation systems must be a co-ordinated
operation by two persons, working in sequence and independently: one should key in and insert the data,
and subsequently the other should recall it and confirm it against source information. It is not sufficient for
one crew member just to observe or assist another crew member inserting the data.
8.3.15 The ramp position of the aircraft, plus at least two additional waypoints, or, if the onboard
equipment allows, all the waypoints relevant to the flight, should be loaded while the aircraft is at the ramp.
However, it is more important initially to ensure that the first en route waypoint is inserted accurately.
Note - The vast majority of commercial air transport aircraft operating in MNPS airspace have an
IRS/INS as part of their Long Range navigation fit. An increasing number of those with IRS/INS also
have GPS and whilst GPS may then be considered the primary LRNS, these aircraft are still required
to input the ramp position. This should then be compared with the GPS solution. For those few
aircraft with GPS as the only LRNS, whilst there may be no need to actually load the ramp position,
it is good airmanship and recommended operational practice to compare the published ramp
position with the GPS-derived position. Without selective availability GPS should give a position
NORTH ATLANTIC MNPSA OPERATIONS MANUAL CHAPTER 8
NAT MNPS 46 Edition 2005
within 30 metres of the published ramp position. If the GPS position is more than 100 metres from
the published ground position, then the cause should be investigated. If sufficient satellites are in
view the most likely causes are GPS receiver error, atmospheric interference, or, incorrect ramp coordinates.
8.3.16 During flight, at least two current waypoints beyond the leg being navigated should be
maintained in the Control Display Units (CDUs) until the destination ramp co-ordinates are loaded. Two
pilots should be responsible for loading, recalling and checking the accuracy of the inserted waypoints; one
loading and the other subsequently recalling and checking them independently. However, this process
should not be permitted to engage the attention of both pilots simultaneously during the flight. Where
remote loading of the units is possible, this permits one pilot to cross-check that the data inserted
automatically is indeed accurate.
8.3.17 An alternative and acceptable procedure is for the two pilots silently and independently to
load their own initial waypoints and then cross-check them. The pilot responsible for carrying out the
verification should work from the CDU display to the Master Document rather than in the opposite direction.
This may lessen the risk of the pilot 'seeing what is expected to be seen’ rather than what is actually
displayed.
Flight Plan Check
8.3.18 The purpose of this check is to ensure complete compatibility between the data in the Master
Document and the calculated output from the navigation systems. Typical actions could include:
• checking the distance from the ramp position to the first waypoint. Some systems will account for
the track distance involved in an ATC SID; in others, an appropriate allowance for a SID may have
to be made to the great circle distance indicated in order to match that in the Master Document. If
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航空资料35(84)