-make sure that the landing-gear control-lever 6GA is in the DOWN position
-put a warning notice in position to tell persons not to operate the landing gear.
(4)
Put a warning notice in position to tell persons not to pressurize the Green Hydraulic system.
1EFF : ALL 1 32-11-21Page 402 1 1 Aug 01/05 1 1 1CES 1
R MLG Lockstay Actuating-Cylinder Figure 401/TASK 32-11-21-991-001
1EFF : 1 1 1CES ALL 1 111 32-11-21 Page 403 May 01/01
Subtask 32-11-21-582-050
B. Lift the Aircraft
(1) Lift the aircraft on jacks (Ref. TASK 07-11-00-581-001).
R R R (2) Make sure that the GROUND LOCK SLEEVE (460005833) or the GROUNDLOCK SLEEVE (460007280) is installed on the applicable MLG lockstay actuating cylinder (Ref. TASK 32-00-00-481-001).
Subtask 32-11-21-860-050
C. Aircraft Maintenance Configuration
(1) Disconnect the isolation coupling of the PTU (Ref. TASK 29-23-00-860-001).
R R (2) Make sure that the Yellow and Green Hydraulic systems are de-pressurized (Ref. TASK 29-00-00-864-001).
R (3) Depressurize the Green Hydraulic-system reservoir (Ref. TASK 29-14-00-614-001).
Subtask 32-11-21-869-053
D. Flight Configuration Precautions
(1) If the electrical power is not necessary for other maintenance tasks, de-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002). Then, it is not necessary to operate the LGCIU circuit breakers.
(2) If the electrical power is necessary, do the precautions for flight configuration (Ref. TASK 32-00-00-860-001) before you open the LGCIU circuit breakers.
Subtask 32-11-21-865-050
E. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34
1EFF : ALL 1 32-11-21Page 404 1 1 May 01/01 1 1 1CES 1 1EFF : ALL 1 32-11-21Page 405 1 1 May 01/05 1 1 1CES 1
Subtask 32-11-21-010-050
F. Get Access
(1) Put an access platform below the applicable MLG lockstay actuating cylinder, at zone 731 or 741.
(2) Put a container below the applicable actuating cylinder.
4. Procedure_________
(Ref. Fig. 401/TASK 32-11-21-991-001)
Subtask 32-11-21-020-051
R A. Removal of the MLG Lockstay Actuating Cylinder
WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:_______ - FLUSH IT AWAY WITH CLEAN WATER - GET MEDICAL AID.
CAUTION : MAKE SURE THAT THE FLUID DOES NOT STAY ON THE AIRCRAFT_______ STRUCTURE. IF THE FLUID GETS ON THE AIRCRAFT STRUCTURE, WASH IT OFF IMMEDIATELY WITH SOAP AND WATER.
(1) Disconnect one end of the MLG lock springs from the MLG side-stay (Ref. TASK 32-11-19-000-003).
(2) Remove the MLG lockstay actuating cylinder as follows:
(a) Remove and discard the cotter pin (10).
(b) Remove the nut (9) and the washer (8).
(c) Release the tab washer (16).
R R R (d) Use the TOOL-HOLDING (460006437) to hold the pin (13) and remove the bolt (15), the tab washer (16) and the sleeve (17). Discard the tab washer (16).
R R WARNING : CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE_______ TASK. LOOSE LOCKWIRE CAN CUT OR BLIND YOU.
R
(e) Remove and discard the lockwire from the bolts (5).
(f)
Remove the bolts (5) and the washers (4) from the hoses (1).
(g)
Move the hoses (1) away from the actuating cylinder (12). Remove and discard the packings (3) and the back-up packings (2).
(h)
Put blanking plugs on the disconnected line ends.
(3)
If the actuating cylinder is to be replaced:
-remove the GROUND LOCK SLEEVE from the applicable actuating cylinder.
(4)
Hold the actuating cylinder (12) (weight 3.3 kg (7.2752 lb)) and
remove: R - the pin (7)
-the washers (6) and (11) R - the pin (13)
-the washers (14).
(5) Remove the actuating cylinder (12).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架2(84)