(11) in the bottom torque link assembly.
(2)
Put the spacer assembly (3) in position on the sleeve (9). Make sure that the spacer assembly flange touches the top torque link assembly.
(3)
Carefully install the torque link pin (6) into the torque link damper (5).
1EFF : ALL 1 32-11-29Page 410 1 1 May 01/05 1 1 1CES 1
(4)
Put the spacer (4) in position on the torque link pin (6).
(5)
Install the torque link pin (6) through the spacer assembly (3), the top torque link assembly and the sleeve (9).
(6)
Install the torque link damper (5) on the spacer assembly (3) with the bolts (1) and the washers (2). TORQUE tighten the bolts (1) in a diagonal sequence to 3.39 m.daN (24.99 lbf.ft).
(7)
Safety the top and bottom bolts (1) together in pairs with
MISCELLANEOUS (Material No. 19-010).
(8)
Align the apex of the top and bottom torque links assemblies.
(9)
Put and hold the spacer (12) in position between the top and the
bottom torque link assemblies.
(10)
Push the torque link pin (6) through the torque link damper (5) and the top and bottom torque link assemblies. Push the pin (6) until the head is against the flange of the torque link damper (5).
(11)
Install the spacer (12) and the nut (13) on the torque link pin (6).
(12)
Hold the torque link pin (6) with the TORQUE REACTION ADAPTOR (460007242) and TORQUE tighten the nut (13) to 22.3 m.daN (164.45 lbf.ft).
(13)
Loosen the nut (13) and do the torque sequence, step (12) two more times.
(14)
Loosen the nut (13) and TORQUE tighten to between 13.5 and 22.3 m.daN
(99.55 and 164.45 lbf.ft). Make sure that the slot in the nut (13) aligns with the hole in the torque link pin (6).
(15)
Install the bolt (16) through the nut (13) and the torque link pin (6).
(16)
Install the nut (14) on the bolt (16).
(17)
TORQUE tighten the nut (14) to between 0.5 and 1.0 m.daN (44.24 and
88.49 lbf.in).
(18)
Safety the nut (14) with the new cotter pin (15).
(19)
Install the cover (7) and safety with the new cable tie (8).
(20)
Fill the torque link damper (5) (Ref. TASK 12-12-32-611-006).
R 1EFF : 001-003, 051-052, 1 32-11-29Page 411 1 1 May 01/05 1 1 1CES 1R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499,
Subtask 32-11-29-420-051-B
A. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).
(2)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(3)
Do an inspection of the component interface and/or the adjacent area.
NOTE : In the step that follows, make sure that the Materials No.
____ 04-004 and No. 04-022 are not mixed together. Do not use them at the same time (Ref. SIL 12-008).
(4) Lubricate the items that follow with COMMON GREASE (Material No. 04-004) or COMMON GREASE (Material No. 04-022):
-
the spacers (1), (15) and (17)
-
the torque link pin (3)
-
the shaped spacer (6)
-
the sleeves (7) and (16)
-
the threads of the bolts (9) and (10)
-
the washers (8) and (14)
-
the nut (18)
-
the mating surfaces of the torque link damper (2)
-
the hinge points of the top and bottom torque link assemblies.
Subtask 32-11-29-420-050-B
B. Installation of the Torque Link Damper
(1)
Install the sleeve (7) in the top torque link assembly and the sleeve
(16) in the bottom torque link assembly.
(2)
Assemble the bracket (12) to the shaped spacer (6) and install the washers (14) and the bolts (13). TORQUE tighten the bolts (13) to between 0.8 and 1.0 m.daN (70.79 and 88.49 lbf.in).
(3)
Put the shaped spacer (6) in position on the sleeve (7). Make sure that the flange of the shaped spacer touches the top torque link assembly.
R 1EFF : 004-049, 053-099, 101-149, 151-199, 1 32-11-29Page 412 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
(4)
Carefully install the torque link pin (3) into the torque link damper (2).
(5)
Put the spacer (1) in position on the torque link pin (3).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架2(109)