Top and Bottom Torque-Links Axial Clearance Check
 Figure 601/TASK 32-11-27-991-003
R 1EFF : 001-003, 051-052, 1 32-11-27Page 605 1 1 May 01/05 1 1 1CES 1
 Top and Bottom Torque-Links Axial Clearance Check Figure 601A/TASK 32-11-27-991-003-A 
R 1EFF : 004-049, 053-099, 101-149, 151-199, 1 32-11-27Page 606 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
R R  Top and Bottom Torque-Links Radial Clearance Check Figure 602/TASK 32-11-27-991-010 
 1EFF : 1 1 1CES  ALL  1 111 32-11-27 Page 607 Nov 01/00
 Torque-Link Apex Joint Detail
 Figure 603/TASK 32-11-27-991-008
R 1EFF : 001-003, 051-052, 1 32-11-27Page 608 1 1 May 01/05 1 1 1CES 1
 Torque-Link Apex Joint Detail Figure 603A/TASK 32-11-27-991-008-B 
R 1EFF : 004-049, 053-099, 101-149, 151-199, 1 32-11-27Page 609 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
 (b) At the bottom, make sure that the total of the dimensions C + D is not more than 1.156 mm (0.0455 in.).
 NOTE : Refer to (Ref. CMM 321133) for corrective action.
____
 Subtask 32-11-27-220-058-B
 B. Inspection Procedure
 (1) Do a check of the radial clearance at the top torque-link joint as follows:
 (a)
 Carefully remove the top torque-link pin (Ref. TASK 32-11-27-000-001). (Ref. Fig. 602/TASK 32-11-27-991-010)
 (b)
 Use an external micrometer 50-75 mm (2.0-3.0 in.) to measure the diameter X of the pin and record the minimum dimension.
 NOTE : Measure the diameter of the pin where it touches the
____ bushes in the top torque link and the MLG leg.
 (c)
 Use an internal micrometer to measure the internal diameter E and F of the bushes in the:
 -top torque link
 -MLG leg.
 Record the maximum dimension.
 (d)
 Subtract dimension X from the maximum dimension E or F to give the clearance at the top pin position. A maximum in-service clearance of 0.119 mm (0.0046 in.) is permitted.
 (e)
 Install the top torque-link pin (Ref. TASK 32-11-27-400-001).
 NOTE : Refer to (Ref. CMM 321133) for corrective action.
____
 (2) Do a check of the radial clearance at the bottom torque-link joint as follows:
 (a) Carefully remove the bottom torque-link pin (Ref. TASK 32-11-27-000-001). (Ref. Fig. 602/TASK 32-11-27-991-010) 
R 1EFF : 001-003, 051-052, 1 32-11-27Page 610 1 1 May 01/05 1 1 1CES 1
 (b) Use an external micrometer 50-75 mm (2.0-3.0 in.) to measure the diameter Y of the pin and record the minimum dimension.
 NOTE : Measure the diameter of the pin where it touches the
____ bushes in the bottom torque link and the shock absorber.
 (c)
 Use an internal micrometer to measure the internal diameter G and H of the bushes in the:
 -bottom torque link
 -shock absorber. Record the maximum dimension.
 (d)
 Subtract dimension Y from the maximum dimension G or H to give the clearance at the bottom pin position. A maximum in-service clearance of 0.119 mm (0.0046 in.) is permitted.
 (e)
 Install the bottom torque-link pin (Ref. TASK 32-11-27-400-001).
 NOTE : Refer to (Ref. CMM 321133) for corrective action.
____
 Subtask 32-11-27-220-060-B
 C. Inspection Procedure
 (1) Do a check of the radial clearances at the torque-link apex joint as follows:
 (a)
 Carefully remove the torque-link apex pin (1) and the torque-link sleeves (2) and (3) (Ref. TASK 32-11-27-000-001). Make sure that each sleeve is correctly identified with the applicable torque link. (Ref. Fig. 603/TASK 32-11-27-991-008)
 (b)
 At the top torque-link bushes:
 1_ Use an internal micrometer to measure the internal diameter R 
 and S of the bushes. Record the maximum dimension. 
 2_ Use an external micrometer 25-50 mm (1.0-2.0 in.) to measure 
 the external diameter P of the sleeve (2) and record the 
 minimum dimension. 
 3_ Subtract dimension P from the maximum dimension R or S to give 
 the sleeve clearance. A maximum in-service sleeve clearance of 
 0.50 mm (0.0196 in.) is permitted. 
R 1EFF : 001-003, 051-052, 1 32-11-27Page 611 1 1 May 01/05 1 1 1CES 1
 4_ Use an internal micrometer to measure the internal diameter Q 
 of the sleeve (2) and record the maximum dimension. 
 5_ Use an external micrometer 25-50 mm (1.0-2.0 in.) to measure 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架2(101)