• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:50来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

39  backing rings 
39  backing rings 
R  40  O-ring 
40  O-ring 
40  O-ring 
40  O-ring 
R  46  packer 
46  packer 
46  packer 
46  packer 
R  47  tab washer 
47  cup washers 
47  cup washers 
47  tab washer 
R  48  retaining pins 
48  retaining pins 
48  retaining pins 
48  retaining pins 
49  backing rings 
49  backing rings 
50  O-rings 
50  O-rings 
R  53  tab washer 
53  tab washer 
53  cotter pins 
53  cotter pins 
54  tab washer 
54  tab washer 
54  O-ring 
54  O-ring 
55  backing ring 
55  backing ring 
55  backing rings 
55  backing rings 
56  O-rings 
56  O-rings 
59  cotter pins 
59  cotter pins 
61  backing ring 

32-11-13 02E-16032-11-13 02G-110 32-11-13 01A-06032-11-13 01E-06032-11-13 01F-06032-11-13 01G-060 32-11-13 01A-05032-11-13 01E-05032-11-13 01F-05032-11-13 01G-050 32-11-13 01A-01532-11-13 01E-01532-11-13 01F-01532-11-13 01G-015 32-11-11 60A-06032-11-11 60E-05032-11-11 60F-05032-11-11 60G-060 32-11-11 60A-04032-11-11 60E-04032-11-11 60F-04032-11-11 60G-04032-11-13 01E-15032-11-13 01F-15032-11-13 01E-14032-11-13 01F-140 32-11-11 60A-07032-11-11 60G-07032-11-11 65C-01032-11-11 65D-01032-11-11 60E-05032-11-11 60F-05032-11-11 65C-14032-11-11 65D-14032-11-11 65C-15032-11-11 65D-15032-11-13 01E-15032-11-13 01F-15032-11-13 01E-14032-11-13 01F-14032-11-11 65C-01032-11-11 65D-01032-11-11 65C-150
 1EFF : ALL 1 32-11-13Page 424 1 1 May 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
61  backing ring  32-11-11 65D-150
 62  O-ring  32-11-11 65C-140
 62  O-ring  32-11-11 65D-140
 D. Referenced Information

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
07-11-00-586-002  Lowering of the Aircraft for Maintenance Operations
 12-12-32-611-008  Hydraulic Replenishment of the MLG Two-Stage Shock
 Absorber
 20-28-00-912-004  Electrical Bonding of Components With Conductive
 Bolts and Screws and Bonding Straps in the Fuselage
 and in the Wings (this does not include the tanks)-
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the
 External Power
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied
 from the External Power
 29-10-00-863-001  Pressurize the Green Hydraulic System
 29-10-00-863-002  Pressurize the Yellow Hydraulic System
 29-10-00-864-001  Depressurize the Green Hydraulic System
 29-10-00-864-002  Depressurize the Yellow Hydraulic System
 29-14-00-614-001  Depressurization of the Hydraulic Reservoirs
 29-14-00-614-002  Pressurization of the Hydraulic Reservoirs through
 the Ground Connector
 32-00-00-481-001  Installation of the Safety Devices on the Landing
 Gears
 32-00-00-860-001  Flight Configuration Precautions with Electrical
 Power
 32-00-00-860-002  Ground Configuration after Flight Configuration with
 Electrical Power
 32-11-13-400-003  Installation of the MLG Shock-Absorber Gland-Seals
 32-11-43-400-003  Installation of the 1M and 2M Harnesses on the MLG
 Axle
 32-12-00-010-001  Open the Main Gear Doors for Access
 32-31-00-720-002  Functional Test of the Normal Extension and
 Retraction of the Landing Gear
 32-41-11-400-006  Installation of the MLG Wheel
 (2649GM,2650GM,2651GM,2652GM)
 32-42-27-400-001  Installation of the Brake
 (2641GM,2642GM,2643GM,2644GM)

 1EFF : ALL 1 32-11-13Page 425 1 1 May 01/05R 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架2(20)