(12)
Install the new wiper ring (17). Make sure that the wiper ring (17) is correctly installed. The open U section points out.
(13)
Install the new seals (1) and (2).
(14)
Allow one hour for the seal (2) to go back to its initial dimensions, before you continue.
(15)
Lubricate the parts that follow with HYDRAULIC FLUIDS (Material No. 02-001) or HYDRAULIC FLUIDS (Material No. 02-004):
-
the internal diameter of the lower bearing housing (10)
-
the external diameter of the sliding tube assembly (11).
(16)
Use the ASSEMBLY SLEEVE (460006405) to carefully install the lower bearing housing (10) on the sliding tube (11).
(17)
Install the upper bearing housing (7) on the sliding tube sub-assembly (25).
(18)
Install the upper diaphragm tube assembly (3) in the sliding tube sub-assembly (25).
(19)
Install the two-part stop (8), make sure that the pins (9) engage with the key-ways in the sliding tube sub-assembly (25).
1EFF : 301-399, 1 32-11-13Page 492 1 1 May 01/05 1 1 1CES 1
(20)
Use the PIN SPANNER (460007279) to torque the upper bearing housing
(7) to 60.0 m.daN (442.47 lbf.ft).
(21)
Reduce the torque on the upper bearing housing (7) to zero.
(22)
Do steps (20) and (21) two more times.
(23)
Torque the upper bearing housing (7) to between 50.0 and 60.0 m.daN
(368.73 and 442.47 lbf.ft).
(24)
Install the lock-plate (6) in the correct position.
(25)
Install the new tab washers (5) and the screws (4).
(26)
Torque the screws (4) to between 0.113 and 0.225 m.daN (9.99 and
19.91 lbf.in) then safety the screws (4) with the tab washers (5). **ON A/C ALL
5. Close-up
________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 32-11-13-410-053
A. Close Access
(1) Use the LIFTING TACKLE (460006211) to remove the MLG shock absorber from the BUILD TROLLEY.
(2) Install the MLG shock absorber (Ref. TASK 32-11-13-400-001).
**ON A/C 301-399,
Subtask 32-11-13-410-053-A
A. Close Access
(1)
Use the LIFTING TACKLE (460006211) to remove the MLG shock absorber from the BUILD TROLLEY.
(2)
Install the MLG shock absorber (Ref. TASK 32-11-13-400-001).
1EFF : ALL 1 32-11-13Page 493 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
Subtask 32-11-13-860-061
B. Aircraft Maintenance Configuration
(1) Pressurize the applicable hydraulic reservoirs (Ref. TASK 29-14-00-614-002).
Subtask 32-11-13-942-055
C. Removal of Equipment
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the warning notice(s).
(3)
Remove the safety barriers
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
1EFF : ALL 1 32-11-13Page 494 1 1 May 01/05 1 1 1CES 1 SIDE STAY ASSY - MLG (2505GM,2506GM) - REMOVAL/INSTALLATION
___________________________________________________________
TASK 32-11-16-000-001
Removal of the MLG Side-Stay Assembly 2505GM, 2506GM
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
R No specific thin-nose pliers No specific trestle No specific warning notice No specific container 1 l (0.2641 USgal) No specific access platform 2.5 m (8 ft. 2 in.) No specific access platform 3 m (9 ft. 10 in.) 460005812 1 TORQUE ADAPTOR 460005834 1 TUBE SPANNER 460007272 1 TUBE SPANNER 98D32104013001 1 SPLINT ASSEMBLY - SIDE STAY 98D32104013004 1 HOIST 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架2(41)