R 1EFF : 001-003, 051-052, 1 32-11-12Page 434 1 1 May 01/05 1 1 1CES 1
(ae) TORQUE the unions (7) and (8) to between 2.4 and 2.8 m.daN (17.69 and 20.64 lbf.ft).
(af) Safety the unions (7) and (8) with MISCELLANEOUS (Material No. 19-010).
(ag) Put the line support block assemblies (6) in position on the flexible hoses (9), (11), (12) and (14). Loosely install the bolts (4), the washers (5) and (3), and the nuts (2).
(ah) Make sure that the dimension X is between 35 and 40 mm (1.38 and
1.57 in.).
(ai) Tighten the nuts (2) and safety with a new cotter pin (1). R **ON A/C 004-049, 053-060, 101-101,
Subtask 32-11-12-420-051-A
B. Installation of the MLG Hydraulic Dressings NOTE : Remove the blanking plugs immediately before you install the
____ applicable rigid pipes and flexible hydraulic hoses.
(1) To install the rigid hydraulic pipes, do the steps that follow:
(a)
Put the pipe (62) in position in the applicable line support blocks. Connect the union (61) and install the locknut (73).
(b)
Put the pipe (63) in position in the applicable line support blocks. Connect the union (64) and install the locknut (76).
(c)
Put the pipe (55) in position and connect the union (80). Install the locknut (58).
(d)
Put the pipe (56) in position and connect the union (77). Install the locknut (57).
(e)
TORQUE the locknuts (73), (76) and (58) to between 2.7 and 3.1 m.daN (19.91 and 22.86 lbf.ft).
(f)
TORQUE the locknut (57) to between 5.7 and 6.78 m.daN (42.03 and
49.99 lbf.ft).
(g)
Put the band-clamps (92) in position and tighten the band-clamp nuts (91).
R 1EFF : 001-049, 051-060, 101-101, 1 32-11-12Page 435 1 1 May 01/05 1 1 1CES 1
(h)
Examine the routings of the rigid hydraulic pipes for correct installation. Make sure that the pipes do not touch the MLG leg or each other.
(i)
Safety the band-clamp nuts (91) MISCELLANEOUS (Material No. 19-010).
(2) To install the flexible hydraulic hoses, do the steps that follow:
NOTE : When you install the flexible hoses, make sure that you do not
____
put kinks in them.
(a)
Put the flexible hose (65) in position and connect the union (60).
(b)
Put the flexible hose (66) in position and connect the union (59).
(c)
Put the flexible hose (32) in position and connect the union (31).
(d)
Put the flexible hose (29) in position and connect the union (30).
(e)
Put the flexible hose (11) in position and connect the unions
(12) and (75).
(f)
Put the flexible hose (9) in position and connect the unions (10) and (74).
(g)
TORQUE the unions (60), (31), (30), (12), (10), (74) and (75) to between 2.4 and 2.8 m.daN (17.69 and 20.64 lbf.ft).
(h)
TORQUE the union (59) to between 4.79 and 5.23 m.daN (35.32 and
38.56 lbf.ft).
(i)
Put the channels (38) in position on the flexible hoses (9) and (11). Install them with the bolts (37), the washers (39) and the nuts (40).
(j)
TORQUE the nuts (40) to between 0.4 and 0.45 m.daN (35.39 and
39.82 lbf.in) and safety with the new cotter pin (41).
(k)
Put the line support block assembly (35) in position on the flexible hoses (9) and (11). Loosely install with the bolts (36), the washers (34) and the nuts (33).
R 1EFF : 004-049, 053-060, 101-101, 1 32-11-12Page 436 1 1 May 01/05 1 1 1CES 1
(l)
Make sure that dimension Y is 150 mm (5.91 in.).
(m)
TORQUE the nuts (33) to between 0.4 and 0.45 m.daN (35.39 and
39.82 lbf.in).
(n)
Put the flexible hose (24) in position and connect the unions
(23) and (71).
(o)
Put the flexible hose (25) in position and connect the unions
(26) and (72).
(p)
TORQUE the unions (26), (72), (23) and (71) to between 2.4 and
2.8 m.daN (17.69 and 20.64 lbf.ft).
(q)
Put the channels (38) in position on the flexible hoses (24) and (25). Install them with the bolts (37), the washers (39) and the nuts (40).
(r)
TORQUE the nuts (40) to between 0.4 and 0.45 m.daN (35.39 and
39.82 lbf.in) and safety with the new cotter pin (41).
(s)
Put the line support block assembly (35) in position on the flexible hoses (24) and (25). Loosely install with the bolts (36), the washers (34) and the nuts (33).