1EFF : ALL 1 32-11-46Page 415 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 32-11-46Page 416 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 061-099, 102-149, 151-199, 201-299, 401-499,
R R R R R R R R R R R R R -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/PARK BRK/CTL/STBY 71GG N37 121VU HYDRAULIC/PARK BRK/CTL/NORM 70GG N36 121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42 121VU ENGINE/IGN/ENG1/SYS B 3JH1 P41 121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40 121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B 2WE1 Q44 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A 1WE1 Q43 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B 2WE2 Q42 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A 1WE2 Q41 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34 121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41
R **ON A/C 051-099, 301-399,
R R R 121VU HYDRAULIC/BRK FAN/WHEELS/3 AND 4 121VU HYDRAULIC/BRK FAN/WHEELS/1 AND 2 121VU HYDRAULIC/BRK/FAN/CTL 2GS 1GS 3GS L35 L32 M32
R **ON A/C 051-099,
R 121VU HYDRAULIC/TIRE/PRESS 1GV M31
**ON A/C ALL
122VU LIGHTING/LANDING LT/R/CTL 122VU LIGHTING/LANDING LT/R/SPLY 122VU LIGHTING/LANDING LT/L/CTL 122VU LIGHTING/LANDING LT/L/SPLY 4LB 2LB 3LB 1LB T07T06T05T04
4. Procedure_________
**ON A/C 001-049, 051-060, 101-101,
(Ref. Fig. 401/TASK 32-11-46-991-001)
(Ref. Fig. 401A/TASK 32-11-46-991-001-A)
**ON A/C 301-399,
(Ref. Fig. 401B/TASK 32-11-46-991-001-B)
**ON A/C ALL
Subtask 32-11-46-420-052-A
A. Preparation for Installation
(1)
Do an inspection of the component interface and/or the adjacent area.
(2)
Clean the component interface and/or the adjacent area with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).
(3)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(4)
Make sure that the electrical connectors are clean and in the correct condition.
Subtask 32-11-46-420-051-A
B. Installation of the MLG Disconnection Box
(1)
Put the MLG disconnection box (16) between the mid and aft beams of the overwing panel Z571 (Z671), and install it with the screws (2) (Ref. TASK 20-28-00-912-004).
(2)
Carefully move the electrical connections (7), (8) and (12) into their slots in the MLG disconnection box (16).
(3)
Remove the blanking caps from the electrical connectors.
(4)
Install the electrical receptacle 4027VC (4028VC) into its retaining plate.
1EFF : ALL 1 32-11-46Page 417 1 1 Aug 01/05 1 1 1CES 1
(5)
Connect the electrical connector (3) to 4027VC (4028VC) and make sure that the route of the cable (13) is correct. Put the cleat (15) in position and install the screw (14).
(6)
Tighten the electrical connections (7), (8) and (12), and safety with BONDING AND ADHESIVE COMPOUNDS (Material No. 08-048).
(7)
Clean the electrical connectors (3), (7), (8) and (12) with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).