R **ON A/C 001-049, 101-149, 151-199, 201-299,
Subtask 32-11-43-860-053
D. Aircraft Maintenance Configuration
(1) Make sure that the applicable MLG wheels are removed (Ref. TASK 32-41-11-000-006).
(2) Make sure that the applicable tachometers are removed (Ref. TASK 32-42-57-000-001).
(3) Make sure that the applicable MLG door is open (Ref. TASK 32-12-00-010-001).
(4) Make sure that the access platform is adjacent to the applicable MLG.
(5) Make sure that the applicable access panel is open 574AB(674AB).
R **ON A/C 051-099,
R Subtask 32-11-43-860-053-B
R D. Aircraft Maintenance Configuration
R R (1) Make sure that the applicable MLG wheels are removed (Ref. TASK 32-41-11-000-006).
R R (2) Make sure that the applicable brake fan assemblies are removed (Ref. TASK 32-48-51-000-005).
R R (3) Make sure that the applicable TPIS rotating mechanisms are removed (Ref. TASK 32-49-18-000-001).
R R (4) Make sure that the applicable tachometers are removed (Ref. TASK 32-42-57-000-001).
R R (5) Make sure that the applicable MLG door is open (Ref. TASK 32-12-00-010-001).
R (6) Make sure that the access platform is adjacent to the applicable MLG.
R (7) Make sure that the applicable access panel is open 574AB(674AB).
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-11-43Page 458 1201-299, 1May 01/05 1 1 1CES 1R **ON A/C 301-399, 401-499,
Subtask 32-11-43-860-053-A
D. Aircraft Maintenance Configuration
(1)
Make sure that the applicable MLG wheels are removed (Ref. TASK 32-41-11-000-006).
(2)
Make sure that the applicable brake fan assemblies are removed (Ref. TASK 32-42-27-000-001).
(3)
Make sure that the applicable tachometers are removed (Ref. TASK 32-42-57-000-001).
(4)
Make sure that the applicable MLG door is open (Ref. TASK 32-12-00-010-001).
(5)
Make sure that the access platform is adjacent to the applicable MLG.
(6) Make sure that the applicable access panel is open 574AB(674AB). **ON A/C ALL
4. Procedure
_________
Subtask 32-11-43-420-076
A. Preparation For Installation
(1)
Clean the component interfaces and the adjacent areas with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(4)
Make sure that the electrical connectors are clean and in the correct condition.
1EFF : ALL 1 32-11-43Page 459 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 001-003, 051-052,
Subtask 32-11-43-420-077
B. Installation of the 1M and 2M Harnesses on the MLG Axle
(1) Make sure that there are no kinks in the 1M and 2M harnesses. CAUTION : MAKE SURE THAT ALL ELECTRICAL CONNECTORS ARE IDENTIFIED
_______ WITH THEIR FIN NO. TO CORRECTLY CONNECT EACH PLUG TO ITS RELATED RECEPTACLE. INCORRECT CONNECTION OF THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO THE AIRCRAFT ELECTRICAL SYSTEM.
(Ref. Fig. 409/TASK 32-11-43-991-029)
(2)
Identify the positions of the three cableforms at the end of each harness.
(3)
If necessary, attach a draw string to each applicable cableform at the cable access holes.
(4)
Pull the draw strings through the axle, one at a time, to put the cableforms in position. Remove the draw strings.
(5)
Remove the blanking caps from the electrical connectors.
(6)
For the 1M harness:
(Ref. Fig. 408/TASK 32-11-43-991-028)
(a)
Put the electrical connector (15) in the slot of the bracket (6). Make sure that the connector nut (16) is behind the bracket (6).
(b)
Install the connector (15) with the bolts (17), the washers (14) and the nuts (13).
(c)
Tighten the connector nut (16).