(e)
Install the bottom torque-link pin (Ref. TASK 32-11-27-400-001).
NOTE : Refer to (Ref. CMM 321225) for corrective action.
____
R 1EFF : 004-049, 053-099, 101-149, 151-199, 1 32-11-27Page 614 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 32-11-27-220-060
C. Inspection Procedure
(1) Do a check of the radial clearances at the torque-link apex joint as follows:
(a)
Carefully remove the torque-link apex pin (1) and the torque-link sleeves (2) and (3) (Ref. TASK 32-11-27-000-001). Make sure that each sleeve is correctly identified with the applicable torque link. (Ref. Fig. 603A/TASK 32-11-27-991-008-B)
(b)
At the top torque-link bushes:
(c)
At the bottom torque-link bushes: 1 Use an internal micrometer to measure the internal diameter T
1_ Use an internal micrometer to measure the internal diameter R
and S of the bushes. Record the maximum dimension.
2_ Use an external micrometer 25-50 mm (1.0-2.0 in.) to measure
the external diameter P of the sleeve (2) and record the
minimum dimension.
3_ Subtract dimension P from the maximum dimension R or S to give
the sleeve clearance. A maximum in-service sleeve clearance of
0.50 mm (0.0196 in.) is permitted.
4_ Use an internal micrometer to measure the internal diameter Q
of the sleeve (2) and record the maximum dimension.
5_ Use an external micrometer 25-50 mm (1.0-2.0 in.) to measure
the external diameter N of the pin (1) and record the minimum
dimension.
NOTE : Measure the diameter of the pin where it touches the____
top torque link.
6_ Subtract dimension N from the maximum dimension Q to give the
pin clearance. A maximum in-service pin clearance of 0.134 mm
(0.0052 in.) is permitted.
_
and U of the bushes. Record the maximum dimension.
R 1EFF : 004-049, 053-099, 101-149, 151-199, 1 32-11-27Page 615 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 2 Use an external micrometer 25-50 mm (1.0-2.0 in.) to measure
_ the external diameter W and X of the sleeve (3). Make sure that the measurements are taken at a position 20 mm (0.7874 in.) from each end of the sleeve (3).
NOTE : The dimensions are taken at the positions W and X to
____ make sure that only the parallel part of the sleeve is measured.
3 Subtract dimension W from the maximum dimension T to give the
_ sleeve clearance. A maximum in-service sleeve clearance of
0.25 mm (0.0098 in.) is permitted. 4 Subtract dimension X from the maximum dimension U to give the
_ sleeve clearance. A maximum in-service sleeve clearance of
0.25 mm (0.0098 in.) is permitted. 5 Use an internal micrometer to measure the internal diameter V
_ of the sleeve (3) and record the maximum dimension.
6 Use an external micrometer 25-50 mm (1.0-2.0 in.) to measure
_ the external diameter N of the pin (1) and record the minimum dimension.
NOTE : Measure the diameter of the pin where it touches the
____
bottom torque link.
7 Subtract dimension N from the maximum dimension V to give the
_ pin clearance. A maximum in-service pin clearance of 0.144 mm (0.0056 in.) is permitted.
8 Install the sleeves (2) and (3) and the torque-link apex pin
_
(1) (Ref. TASK 32-11-27-400-001).
NOTE : Refer to (Ref. CMM 321225) for corrective action.
____
R 1EFF : 004-049, 053-099, 101-149, 151-199, 1 32-11-27Page 616 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
R **ON A/C 301-399,
R Subtask 32-11-27-220-059-C
R A. Inspection Procedure
R (Ref. Fig. 601A/TASK 32-11-27-991-003-A)
R (1) Do a check of the axial clearances at the connections of the top and
R bottom torque-link hinges:
R (a) At the top, make sure that the total of the dimensions A + B is
R not more than 1.156 mm (0.0455 in.).
R (b) At the bottom, make sure that the total of the dimensions C + D
R is not more than 1.156 mm (0.0455 in.).
R NOTE : Refer to (Ref. CMM 321222) for corrective action.____
R Subtask 32-11-27-220-058-C
R B. Inspection Procedure
R (1) Do a check of the radial clearance at the top torque-link joint as
R follows:
R (a) Carefully remove the top torque-link pin (Ref. TASK 32-11-27-000-
R 001).
R (Ref. Fig. 602/TASK 32-11-27-991-010)
R (b) Use an external micrometer 50-75 mm (2.0-3.0 in.) to measure the
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架2(103)