R  diameter X of the pin and record the minimum dimension. 
R  NOTE : Measure the diameter of the pin where it touches the____ 
R  bushes in the top torque link and the MLG leg. 
R  (c) Use an internal micrometer to measure the internal diameter E and 
R  F of the bushes in the: 
R  - top torque link 
R  - MLG leg. 
R  Record the maximum dimension. 
R  (d) Subtract dimension X from the maximum dimension E or F to give 
R  the clearance at the top pin position. A maximum in-service 
R  clearance of 0.119 mm (0.0046 in.) is permitted. 

R 1EFF : 301-399, 1 32-11-27Page 617 1 1 May 01/04 1 1 1CES 1


R  (e) Install the top torque-link pin (Ref. TASK 32-11-27-400-001). 
R  NOTE : Refer to (Ref. CMM 321222) for corrective action.____ 
R  (2) Do a check of the radial clearance at the bottom torque-link joint as 
R  follows: 
R  (a) Carefully remove the bottom torque-link pin (Ref. TASK 32-11-27-
R  000-001). 
R  (Ref. Fig. 602/TASK 32-11-27-991-010) 
R  (b) Use an external micrometer 50-75 mm (2.0-3.0 in.) to measure the 
R  diameter Y of the pin and record the minimum dimension. 
R  NOTE : Measure the diameter of the pin where it touches the____ 
R  bushes in the bottom torque link and the shock absorber. 
R  (c) Use an internal micrometer to measure the internal diameter G and 
R  H of the bushes in the: 
R  - bottom torque link 
R  - shock absorber. 
R  Record the maximum dimension. 
R  (d) Subtract dimension Y from the maximum dimension G or H to give 
R  the clearance at the bottom pin position. A maximum in-service 
R  clearance of 0.119 mm (0.0046 in.) is permitted. 
R  (e) Install the bottom torque-link pin (Ref. TASK 32-11-27-400-001). 
R  NOTE : Refer to (Ref. CMM 321222) for corrective action.____ 
R  Subtask 32-11-27-220-060-C 
R  C. Inspection Procedure 
R  (1) Do a check of the radial clearances at the torque-link apex joint as 
R  follows: 
R  (a) Carefully remove the torque-link apex pin (1) and the torque-link 
R  sleeves (2) and (3) (Ref. TASK 32-11-27-000-001). Make sure that 
R  each sleeve is correctly identified with the applicable torque 
R  link. 
R  (Ref. Fig. 603A/TASK 32-11-27-991-008-B) 

R 1EFF : 301-399, 1 32-11-27Page 618 1 1 May 01/04 1 1 1CES 1


R  (b) At the top torque-link bushes: 
R  1_  Use an internal micrometer to measure the internal diameter R
R  and S of the bushes. Record the maximum dimension. 
R  2_  Use an external micrometer 25-50 mm (1.0-2.0 in.) to measure
R  the external diameter P of the sleeve (2) and record the 
R  minimum dimension. 
R  3_  Subtract dimension P from the maximum dimension R or S to give
R  the sleeve clearance. A maximum in-service sleeve clearance of 
R  0.50 mm (0.0196 in.) is permitted. 
R  4_  Use an internal micrometer to measure the internal diameter Q
R  of the sleeve (2) and record the maximum dimension. 
R  5_  Use an external micrometer 25-50 mm (1.0-2.0 in.) to measure
R  the external diameter N of the pin (1) and record the minimum 
R  dimension. 
R  NOTE : Measure the diameter of the pin where it touches the____ 
R  top torque link. 
R  6_  Subtract dimension N from the maximum dimension Q to give the
R  pin clearance. A maximum in-service pin clearance of 0.134 mm 
R  (0.0052 in.) is permitted. 
R  (c) At the bottom torque-link bushes: 
R  1_  Use an internal micrometer to measure the internal diameter T
R  and U of the bushes. Record the maximum dimension. 
R  2_  Use an external micrometer 25-50 mm (1.0-2.0 in.) to measure
R  the external diameter W and X of the sleeve (3). Make sure 
R  that the measurements are taken at a position 20 mm (0.7874 
R  in.) from each end of the sleeve (3). 
R  NOTE : The dimensions are taken at the positions W and X to____ 
R  make sure that only the parallel part of the sleeve is 
R  measured. 
R  3_  Subtract dimension W from the maximum dimension T to give the
 