 Attachment Components - Condensor Figure 402/TASK 21-52-32-991-002 
 1EFF : 1 1R 1CES  ALL  1 11 1 21-52-32 Page 412 Aug 01/05
 TASK 21-52-32-400-001
 Installation of the Condenser 10HM2 (11HM2)
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______ FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
 NOTE : The procedure is the same for the condensor 10HM2 (11HM2).
____
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific Torque Wrench : range 0.00 to 1.20 m.daN
 (0.00 to 9.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-007 USA MIL-M-7866
 MOLYBDENUM DISULFIDE POWDER (Ref. 20-31-00) Material No. 04-012 USA VV-P-236
 PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00) Material No. 06-007 USA SS-G-659
 GRAPHITE POWDER DRY LUBRICANT (Ref. 20-31-00) Material No. 19-009 USA AMS 5687
 LOCKWIRE STAINLESS STEEL ANNEALED 0.5MM DIA
 (Ref. 20-31-00)
 1EFF : ALL 1 21-52-32Page 413 1 1 Aug 01/05R 1 1 1CES 1
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
5  packing  
5  packing  
5  packing  
6  nuts  
6  nuts  
7  washers  
7  washers  
9  seal  
9  seals  
9  seal  
9  seals  
9  seal  
9  seals  
9  seal  
9  seals  
9  seal  
9  seals  
16  packing  
16  packing  
16  packing  
20  sleeve  
20  sleeve  
20  sleeve  
21  packing  
21  packing  
21  packing  
22  packing  
22  packing  
23  sleeve  
23  sleeve  
23  sleeve  
25  packing  
25  packing 
21-52-03 26 -10021-52-03 26 -100A21-52-03 26A-10021-52-03 26 -14021-52-03 26A-14021-52-03 26 -15021-52-03 26A-15021-52-03 26 -18021-52-03 26 -18021-52-03 26 -180A21-52-03 26 -180A21-52-03 26 -180B21-52-03 26 -180B21-52-03 26 -180C21-52-03 26 -180C21-52-03 26A-18021-52-03 26A-18021-52-03 26 -04021-52-03 26 -040A21-52-03 26A-04021-52-03 08 -01021-52-03 11A-01021-52-03 11B-01021-52-03 26 -12021-52-03 26 -120A21-52-03 26A-12021-61-03 06 -02021-61-03 06 -020A21-52-03 08 -01021-52-03 11A-01021-52-03 11B-01021-61-03 06 -02021-61-03 06 -020A
 1EFF : ALL 1 21-52-32Page 414 1 1 Aug 01/05R 1 1 1CES 1
 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-33-21-618-001 12-33-21-618-001 20-26-00-910-002 21-52-00-200-003  Pre-conditioning through the HP Ground ConnectionPre-conditioning with the APUInstallation of Expansion JointsDetailed Visual Inspection of the Anti-Ice Valve Sense-Lines 
 21-52-43-000-001  Removal of the Pack Downstream Check-Valves 15HM and 
 16HM 
 21-52-43-400-001  Installation of the Pack Downstream Check-Valves 15HM 
 and 16HM 
 21-63-00-710-004 24-41-00-861-002  Operational Test of the Cockpit and Cabin Temperature Control with CFDS/MCDUEnergize the Aircraft Electrical Circuits from the External Power 
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied from the External Power 
 53-35-13-000-002  Removal of the Quick-Release Access Panels from the 
 53-35-13-400-002  Belly Fairing StructureInstallation of the Quick-Release Access Panels on 
 the Belly Fairing Structure 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
R  21-52-32-991-001 **ON A/C 401-499, Fig. 401  
 