 (12.16 and 12.90 lbf.ft).

 (4)
 Put the sense line (57) in position on the temperature pneumatic sensor (58).

 (5)
 TORQUE the sense line (57) connector to between 0.95 and 1.05 m.daN

 (84.07 and 92.92 lbf.in).

 (6)
 Remove the blanking caps from the disconnected electrical connectors.

 (7)
 Connect the electrical connector (53) to the bypass valve (54).

 (8)
 Connect the electrical connector (52) to the anti ice valve (51).

 (9)
 Connect the electrical connectors (59) and (62) to the temperature sensors (60) and (61).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-52-41Page 442 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 (10) Connect the electrical connector (56) to the temperature sensor (55).
 (11) Connect the electrical connector (66) to the temperature sensor (65).
 (12) Connect the electrical connector (68) to the solenoid (67). 
R  **ON A/C 401-499, 
R  Subtask 21-52-41-420-053-C 
R  E. Installation of the Electrical and Sense Line Connections 

R  (Ref. Fig. 403B/TASK 21-52-41-991-003-C) 
R  (1) Remove the blanking plugs from the disconnected line ends. 
R  (2) Put the sense line (60) in position on the water extractor (59). 
R  (3) TORQUE the sense line (60) connector to between 1.65 and 1.75 m.daN 
R  (12.16 and 12.90 lbf.ft). 
R  (4) Remove the blanking caps from the disconnected electrical connectors. 
R  (5) Connect the electrical connector (55) to the bypass valve (56). 
R  (6) Connect the electrical connector (52) to the anti ice valve (51). 
R  (7) Connect the electrical connector (54) to the temperature sensor (53). 
R  (8) Connect the electrical connector (57) to the temperature sensor (58). 
R  (9) Connect the electrical connector (62) to the temperature sensor (61). 
R  **ON A/C ALL
 Subtask 21-52-41-420-054
 F. Installation of the Duct Connections and Cross Beam 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 (Ref. Fig. 402/TASK 21-52-41-991-002)

 

R  **ON A/C 401-499, 
R  (Ref. Fig. 402A/TASK 21-52-41-991-002-B) 
R  **ON A/C ALL
 (1) Make sure that the pipe assembly (38) is in the correct position and install the clamp (36).
 (2) Make sure that the clamp (36) is in the correct position.
 (3) TORQUE the clamp (36) to between 0.51 and 0.56 m.daN (45.13 and 49.55 lbf.in).
 (4) Put the sleeve (10) in position on the condensor flange (8) and install the clamp (9).
 (5) Make sure that the clamp (9) is in the correct position.
 (6) TORQUE the clamp (9) to 0.28 m.daN (24.77 lbf.in) .
 (7) Put the bellows (3) in position on the inlet plenum flange (1) and install the clamp (3).
 (8) Put the sleeve (7) in position on the air outlet (7) and install the clamp (6).
 (9) Put the cross beam (11) in position in the brackets (12) and (15) and install the quick release pins (13) and (14). 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 Subtask 21-52-41-865-052
 G. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 
R  (1) FOR 10HM 2HH, 4HH, 3HH, 1HH, 1HB. 
R  (2) FOR 11HM 22HH, 24HH, 23HH, 21HH, 2HB. 

R 1EFF : ALL 1 21-52-41Page 444 1 1 Aug 01/05 1 1 1CES 1


R  **ON A/C 401-499,
 Subtask 21-52-41-865-052-A
 G. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 
R  (1) FOR 10HM 49HH, 50HH, 51HH, 52HH, 1HB. 
R R (2) FOR 11HM 53HH, 54HH, 55HH, 56HH, 2HB. 
**ON A/C ALL
 Subtask 21-52-41-710-051
 H. Test
 (1) Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001).
 (2) Do a leak check of the air conditioning pack.
 NOTE : Minimum leakage is permitted. After the pack operates some____ minutes, the leakage of air will reduce because the seals have their correct operating temperature.
 (3) Do a leak check of the sense line connections.
 NOTE : Leaks are not permitted.____
 (4) After aprx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001).
 (5) Do the operational test of the cockpit and cabin temperature control (Ref. TASK 21-63-00-710-004). 