• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:51来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  (1) FOR 10HM3 49HH, 50HH, 51HH, 52HH. 
R  (2) FOR 11HM3 53HH, 54HH, 55HH, 56HH.
 **ON A/C ALL
 Subtask 21-52-00-860-053
 K. Pre-conditioning and Leak Check
 (1) Do the pre-conditioning through the APU (Ref. TASK 12-33-21-618-001) or the HP ground connector (Ref. TASK 12-33-21-618-001).
 (2) Do a check for leaks at the sealing plug (1) and at the temperature sensor (5). Leaks are not permitted.
 (3) Stop the pre-conditioning.
 Subtask 21-52-00-710-053
 L. Do the operational test of the pack temperature control system (Ref. TASK 21-61-00-710-001).

 

 5. Close-up
________ Subtask 21-52-00-410-054
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panel/s (Ref. TASK 53-35-13-400-002).

 (a)
 FOR 10HM3

 -191KB.

 (b)
 FOR 11HM3

 


 -192KB.
 (3) Remove the warning notice(s). Subtask 21-52-00-862-055
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
 1EFF : ALL 1 21-52-00Page 517 1 1 Aug 01/05R 1 1 1CES 1


 TASK 21-52-00-790-001 Remove Condenser for Leak Test 10HM2 (11HM2) NOTE : This test is to check the integrity of the internal tubes in the
____ condenser. The test can not be done on the line. The condenser must be returned to the maintenance shop or to the vendor.
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 215200-04


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-52-32-000-001 Removal of the Condenser 10HM2 (11HM2) 21-52-32-400-001 Installation of the Condenser 10HM2 (11HM2) 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-13-400-002 Installation of the Quick-Release Access Panels on the Belly Fairing Structure CMM 215210
 3. Job Set-up
__________ Subtask 21-52-00-861-057
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 1EFF : ALL 1 21-52-00Page 518 1 1 Aug 01/05R 1 1 1CES 1


 Subtask 21-52-00-865-063
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 10HM2 
R  **ON A/C 401-499,
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 52HH  D08 
R  122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC  1HH 3HH  X22X21 
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  4HH  Y19 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC **ON A/C 106-149, 303-399,  2HH  Y18 
R  122VU  4HH  Y19 
R  **ON A/C 401-499, 
R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC **ON A/C ALL 49HH 51HH 50HH  X22 X21Y18
 FOR 11HM2

 

 -------------------------------------------------------------------------------
R  PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 24HH 22HH  W22W21Y21Y20 
R  **ON A/C 401-499,
R R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22W21 Y21Y20 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(6)