Subtask 21-52-21-010-052
D. Get access
(1)
Remove the applicable access panel (Ref. TASK 53-35-13-000-002). 191KB (192KB)
(2)
Remove the pipe assembly between the compressor inlet duct and the primary heat exchanger.
(3)
Remove the pipe assembly between the anti ice valve, bypass valve and the air cycle machine (Ref. TASK 21-52-23-000-002).
(4)
Remove the applicable bypass valve 10HH (11HH) (Ref. TASK 21-61-53-000-001)
4. Procedure
_________ Subtask 21-52-21-020-053
A. Removal of the Compressor Inlet Gasket
(1) Removal of the screws CAUTION : WHEN YOU REMOVE THE SCREWS, MAKE SURE THAT YOU DO NOT CAUSE
_______ DAMAGE TO THE SCREWLOCKS. IF YOU CAUSE DAMAGE TO THE SCREWLOCKS, YOU MUST REMOVE THE UNIT AND SEND IT TO AN APPROVED REPAIR STATION.
(a) Remove the screws (5) and the washers (4).
(2)
Remove the compressor inlet duct (3).
(3)
Remove and discard the compressor inlet gasket (2).
NOTE : You must not install this gasket again.
____
1EFF : ALL 1 21-52-21Page 429 1 1 Aug 01/05R 1 1 1CES 1
INTENTIONALLY BLANK
R 1 1
21-52-21Page 430
1 1 Aug 01/05 1 1 1CES 1
TASK 21-52-21-400-002
Installation of the Compressor Inlet Gasket
WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM_______ FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE : This procedure is just valid for the PN 1263A0000-02/-03 only.____
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R R No specific Torque Wrench : range 0.00 to 1.20 m.daN (0.00 to 9.00 lbf.ft)
B. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
R 2 2 GASKET GASKET 21-52-21 02 -04021-52-21 02B-040
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-33-21-618-001 Pre-conditioning through the HP Ground Connection
12-33-21-618-001 Pre-conditioning with the APU
21-52-23-000-002 Removal of the Pipe Assembly between the Anti-Ice
Valve (if installed), the Bypass Valve and the Air
Cycle Machine
21-52-23-400-001 Installation of the Pipe Assembly between the Main
Heat Exchanger and the Air Cycle Machine
21-52-23-400-002 Installation of the Pipe Assembly between the
Anti-Ice Valve (if installed), the Bypass Valve and
the Air Cycle Machine
21-61-53-000-001 Removal of the Bypass Valve 10HH (30HH)
21-61-53-400-001 Installation of the Bypass Valve 10HH (30HH)
21-63-00-710-004 Operational Test of the Cockpit and Cabin Temperature
Control with CFDS/MCDU
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
53-35-13-000-002 Removal of the Quick-Release Access Panels from the
Belly Fairing Structure
53-35-13-400-002 Installation of the Quick-Release Access Panels on
the Belly Fairing Structure