• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:51来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 1EFF : 051-052, 1 21-52-00Page 821 1 1 May 01/05 1 1 1CES 1


R  (4) Carefully put the new preformed packings (11) and (13) into position 
R  on the compressor return duct (4). 
R  5. Close-up________ 
R  Subtask 21-52-00-410-064 
R  A. Installation of the Compressor Return Duct 
R  (1) Apply a small amount of LOCTITE SILICOMET, or equivalent, to the 
R  threads of the screws (3) and (9). 
R  (2) Apply a small amount of GREASE NEVER SEEZ NSB16, or equivalent, to 
R  the threads of the screws (8). 
R  (3) Make sure that the preformed packings (11) and (13) are in position 
R  on the compressor return duct (4). 
R  (4) Carefully put the compressor return duct (4) in position on the air 
R  cycle machine (14). 
R  (5) Install the washers (10) and the screws (9). 
R  (6) Put the yoke (1) in position and install the washers (2) and the 
R  screws (3). 
R  (7) TORQUE the screws (3) and (9) to between to 0.25 m.daN (22.12 lbf.in) 
R  and to 0.3 m.daN (26.54 lbf.in). 
R  (8) Put the yokes (7) together with the shims (6) and the spacers (5) in 
R  position and install the screws (8) and the nuts (12). 
R  (9) TORQUE the screws (8) to between to 0.25 m.daN (22.12 lbf.in) and to 
R  0.3 m.daN (26.54 lbf.in). 
R  Subtask 21-52-00-865-066 
R  B. Remove the safety clip(s) and the tag(s) and close this(these) circuit 
R  breaker(s): 
R  (1) FOR 10HM1 
R  - 1HH, 2HH, 3HH, 4HH, 
R  (2) FOR 11HM1 
R  - 21HH, 22HH, 23HH, 24HH.

 

R  Subtask 21-52-00-710-054 
R  C. Test 
R  (1) Do the pre-conditioning through The HP ground connector (Ref. TASK 
R  12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001). 
R  (2) Do a leak check of the air cycle machine compressor return duct 
R  connections. 
R  NOTE : Leaks are not permitted.____ 
R  (3) After approx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-
R  21-618-001) (Ref. TASK 12-33-21-618-001). 
R  Subtask 21-52-00-410-065 
R  D. Close Access 
R  (1) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (2) Install the access panel (Ref. TASK 53-35-13-400-002). 
R  FOR 10HM1 
R  191KB. 
R  FOR 11HM1 
R  192KB. 
R  (3) Remove the warning notice(s). 
R  Subtask 21-52-00-862-057 
R  E. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-
R  002).

 

 EXTRACTOR - WATER (10HM8,11HM8) - REMOVAL/INSTALLATION
______________________________________________________ TASK 21-52-16-000-001 Removal of the Water Extractor 10HM8 (11HM8) WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______ FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
 NOTE : The procedure for the water extractor 10HM8 and the water extractor
____ 11HM8 is the same.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-52-16-200-001 Attachment Components (In-Service Wear Limits) -Water Extractor 10HM8 (11HM8) 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the
 Belly Fairing Structure 21-52-16-991-001 Fig. 401 21-52-16-991-002 Fig. 402


 3. Job Set-up__________ Subtask 21-52-16-861-051
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 21-52-16-865-050
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 10HM8 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(28)