R R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  4HH  Y19 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC **ON A/C 106-149, 303-399,  2HH  Y18 
R  122VU  4HH  Y19 
R  **ON A/C 401-499, 
R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  49HH 51HH 50HH  X22 X21Y18 

R 1EFF : ALL 1 21-52-23Page 434 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C ALL
 FOR 11HM12 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 24HH 22HH  W22W21Y21Y20 
R  **ON A/C 401-499,
R R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22W21 Y21Y20 
**ON A/C ALL
 4. Procedure_________ 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 (Ref. Fig. 402/TASK 21-52-23-991-002) 
R  **ON A/C 401-499, 
R  (Ref. Fig. 402A/TASK 21-52-23-991-002-B) 

R 1EFF : ALL 1 21-52-23Page 435 1 1 Aug 01/05 1 1 1CES 1

 **ON A/C ALL


 Subtask 21-52-23-210-053
 A. Inspection of the Pipe Assembly
 (1) Do the detailed visual inspection of the pipe assembly (Ref. TASK 21-
52-00-200-002). R
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-228, 301-302,
 Subtask 21-52-23-420-050 R B. Installation of the Pipe Assembly
 (1)
 Do the detailed visual inspection of the pipe assembly (Ref. TASK 21-52-00-200-002).

 (2)
 Make sure that the parts retained from the removed component are clean and in the correct condition.

 (3)
 Apply lubricant: CAUTION : USE ONLY THE SPECIFIED LUBRICANT TO LUBRICATE THE O-RINGS


_______ AND THE PACKINGS. OTHER LUBRICANTS CAN CAUSE SMOKE OR A SMELL IN THE CABIN WHEN THEY BECOME HOT.
 (a) Apply a small quantity of:
 -COMMON GREASE (Material No. 04-007) or
 -LUBRICANTS (Material No. 06-007) to the new packing (2), packing (3) and the new seal (4).
 NOTE : The material 04-007 is a molybdenum disulfide powder.
____ Before you can apply it you must first make it into a paste. To do this you must mix the powder with pure water or white spirit.
 NOTE : The material 06-007 is applied dry.
____
 (4)
 Remove the blanking plugs from the disconnected line ends.

 (5)
 Clean the component interface and/or the adjacent area.


R 1EFF : ALL 1 21-52-23Page 436 1 1 Aug 01/05 1 1 1CES 1


 (6)
 Put the seal (4) in position in the pipe assembly (8).

 (7)
 Put the packing (2) in position on the air-cycle machine (1) and the packing (3) in position on the pipe assembly (8).

 (8)
 Carefully put the pipe assembly (8) in position on the by-pass valve (7), the air-cycle machine (1) and the anti-ice valve (6).

 (9)
 Install the clamps (5) and (9).


 (10)
 Make sure that the clamps (5) and (9) are in the correct position and TORQUE to between 0.50 and 0.56 m.daN (44.24 and 49.55 lbf.in).

 (11)
 Make sure that the work area is clean and clear of tool(s) and other


 items. R

R **ON A/C 106-149, 229-299, 303-399, 401-499,
 Subtask 21-52-23-420-050-A
R B. Installation of the Pipe Assembly
 (1)
 Do the detailed visual inspection of the pipe assembly (Ref. TASK 21-52-00-200-002).

 (2)
 Make sure that the parts retained from the removed component are clean and in the correct condition.

 (3)
 Apply lubricant:


 CAUTION : USE ONLY THE SPECIFIED LUBRICANT TO LUBRICATE THE O-RINGS
_______ AND THE PACKINGS. OTHER LUBRICANTS CAN CAUSE SMOKE OR A SMELL IN THE CABIN WHEN THEY BECOME HOT.
 (a) Apply a small quantity of:
 -COMMON GREASE (Material No. 04-007) or
 -LUBRICANTS (Material No. 06-007) to the new packing (2) and the new packing (3).
 NOTE : The material 04-007 is a molybdenum disulfide powder.
____ Before you can apply it you must first make it into a paste. To do this you must mix the powder with pure water or white spirit.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(59)