R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC  4HH  Y19

 

 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC  2HH  Y18 
R  **ON A/C 106-149, 303-399, 
R  122VU  4HH  Y19 
R  **ON A/C 401-499, 
R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  49HH 51HH 50HH  X22 X21Y18
 **ON A/C ALL
 FOR 16HM 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 49VU AIR COND/FLOW/CTL &/IND1 122VU AIR COND/FLOW/MIXER/FLAP 122VU AIR COND/FLOW/CTL AND IND/2 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  1HB 3HB 2HB 4HK 3HK 2HK 1HK 21HH 23HH 24HH 22HH  D07V22V21V20V19V18V17W22W21Y21Y20 
R  **ON A/C 401-499,
R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22W21 Y21Y20

 

 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R
 **ON A/C ALL
 Subtask 21-52-43-710-050
 C. Test
 (1)
 Do the pre-conditioning through the HP ground connector or with the APU (Ref. TASK 12-33-21-618-001) (Ref. TASK 12-33-21-618-001).

 (2)
 Do a leak check of the pack downstream check-valve connections. NOTE : Leaks are not permitted.

____

 (3)
 After approx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) (Ref. TASK 12-33-21-618-001).


 5. Close-up
________
 Subtask 21-52-43-410-053-A

 A. Close Access
 (1)
 Install the access panels:
 (Ref. TASK 53-35-13-400-002)
 (Ref. TASK 25-54-12-400-001)


 (a)
 FOR 15HM

 -191BB and
 -131PW.

 (b)
 FOR 16HM


 -192FB and
 -132PW.

 (2)
 Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-002).

 (3)
 Remove the access platform.

 


 Subtask 21-52-43-862-051
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 CHECK VALVE - PACK DOWNSTREAM (15HM,16HM) - INSPECTION/CHECK____________________________________________________________
 TASK 21-52-43-210-001
 Detailed Visual Inspection of Pack-Air Check-Valve Flappers for Condition and Operation
 1. Reason for the Job__________________
 Refer to the MPD TASK: 215000-02
 2. Job Set-up Information______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-52-43-000-001 21-52-43-400-001  Removal of the Pack Downstream Check-Valves 15HM and 16HMInstallation of the Pack Downstream Check-Valves 15HM and 16HM
 3. Job Set-up__________
 Subtask 21-52-43-020-053
 A. Remove the pack downstream check-valve (Ref. TASK 21-52-43-000-001).
 4. Procedure_________
 Subtask 21-52-43-210-052 
R R  A. Inspection of the Check Valve (P/N 769A0000-01 and 769A0000-02) 
R R  (1) Make sure that the check valve is clean. 
R R R (2) Make a full visual inspection of the valve-flap and its seat, the hinge pin and the return spring of the valve-flap for signs of cracks, dents, marks or corrosion. 

 

R R  (3) Make sure that the valve-flap operates correctly on its hinge pin. To do this, move it by hand. Also make sure that the valve-flap touches its seat correctly. 
R  Subtask 21-52-43-210-053 
R  B. Inspection of the Check Valve (P/N 769B0000-01) 
 