R 1EFF : 401-499, 1 21-52-23Page 421 1 1 Aug 01/05 1 1 1CES 1
R  (14) TORQUE the nuts (1) to between 0.85 and 1.0 m.daN (75.22 and 88.49 
 lbf.in).  
R  NOTE : Hold the hexagon part of the retaining cables (3) to prevent____  
R  twisting of the cables when you torque the nuts (1).  
R  Make sure that there is no tension in the cables (3).  
R  This will give a safe and flexible connection.  
R  (15) Wipe clean the excess COMMON GREASE (Material No. 04-012) from the  
R  retaining cables (3).  
R  (16) Make sure that the half-clamps (10) and the clamp (13) are in the  
R  correct position.  
R  (17) TORQUE the clamp (13) to between 0.28 and 0.38 m.daN (24.77 and 33.62  
R  lbf.in) and safety with annealed stainless-steel lockwire, diameter  
R  0.8 mm (0.0314 in.) MISCELLANEOUS (Material No. 19-010).  
R  (18) Remove the blanking cap from the electrical connector (6).  
R  (19) Make sure that the electrical connectors are clean and in the correct 
 condition.  
R  (20) Connect the electrical connector (6).  
R  (21) Make sure that the work area is clean and clear of tool(s) and other 
 items.  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
 Subtask 21-52-23-865-060 
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit 
 breaker(s):  
R  (1) FOR 10HM11 
 - 1HH, 2HH, 3HH, 4HH,  
R  (2) FOR 11HM11 
 - 21HH, 22HH, 23HH, 24HH.
R **ON A/C 401-499,
 Subtask 21-52-23-865-060-A
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
R (1) FOR 10HM11
 -49HH, 50HH, 51HH, 52HH, R (2) FOR 11HM11
 -53HH, 54HH, 55HH, 56HH.
 **ON A/C ALL
 Subtask 21-52-23-710-050
 D. Test
 (1)
 Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001).
 (2)
 Do a leak check of the pipe assembly. NOTE : Minimum leakage is permitted. After the pack operates some
____ minutes, the leakage of air will reduce because the seals have their correct operating temperature.
 (3)
 Do a leak check of the sense line connections.
 NOTE : Leaks are not permitted.
____
 (4)
 After approx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001).
 (5)
 Do the operational test of the cockpit and cabin temperature control (Ref. TASK 21-63-00-710-004).
 5. Close-up
________ Subtask 21-52-23-410-056
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.
 (2)
 Install the access panel (Ref. TASK 53-35-13-400-002).
 FOR 10HM11
 191KB,
 FOR 11HM11
 192KB.
 (3) Remove the warning notice(s). Subtask 21-52-23-862-050
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
 1EFF : ALL 1 21-52-23Page 424 1 1 Aug 01/05R 1 1 1CES 1
 TASK 21-52-23-000-002
 Removal of the Pipe Assembly between the Anti-Ice Valve (if installed), the Bypass Valve and the Air Cycle Machine WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
 1.
 Reason for the Job
__________________
 Self Explanatory
 2.
 Job Set-up Information
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(56)