R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
Subtask 21-52-24-865-052
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
R (1) FOR 10HM4
(a) 1HH, 2HH, 3HH, 4HH, R (2) FOR 11HM4
(a) 21HH, 22HH, 23HH, 24HH.
R **ON A/C 401-499,
Subtask 21-52-24-865-052-A
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
R (1) FOR 10HM4
(a) 49HH, 50HH, 51HH, 52HH,
R (2) FOR 11HM4
(a) 53HH, 54HH, 55HH, 56HH.
**ON A/C ALL
Subtask 21-52-24-710-050
F. Test
(1) Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001).
(2) Do a leak check of the heat exchanger unit connections.
NOTE : Minimum leakage is permitted. After the pack operates some____ minutes, the leakage of air will reduce because the seals have their correct operating temperature.
(3) After approx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001).
(4) Do the operational test of the cockpit and cabin temperature control (Ref. TASK 21-63-00-710-004).
R 1EFF : ALL 1 21-52-24Page 443 1 1 Aug 01/05 1 1 1CES 1
5. Close-up
________ Subtask 21-52-24-410-051
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the access panel (Ref. TASK 53-35-13-400-002)
FOR 10HM4
191KB,
FOR 11HM4
192KB.
(3) Remove the warning notice(s). Subtask 21-52-24-862-050
B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
R 1EFF : ALL 1 21-52-24Page 444 1 1 Aug 01/05 1 1 1CES 1
TASK 21-52-24-000-001- 01
Removal of the Heat Exchanger Unit 10HM4 (11HM4) (From the Air Conditioning Pack)
NOTE : The procedure is the same for the heat exchanger unit 10HM4 and 11HM4.____
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-52-23-000-001 21-52-41-000-001 53-35-13-000-002 CMM 215200 Removal of the Pipe Assembly between the Main Heat Exchanger and the Air Cycle MachineRemoval of the Air Conditioning Pack 10HM (11HM)Removal of the Quick-Release Access Panels from the Belly Fairing Structure
R **ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
21-52-24-991-001 Fig. 401
R **ON A/C 151-199, 401-499,
R R 21-52-24-991-001-A Fig. 401A
R 1EFF : ALL 1 21-52-24Page 445 1 1 Aug 01/05 1 1 1CES 1
**ON A/C ALL
3. Job Set-up__________
Subtask 21-52-24-010-052
A. Get Access
(1) Remove the access panel/s (Ref. TASK 53-35-13-000-002).
(a) FOR 10HM4 - 191KB;
(b) FOR 11HM4 - 192KB.
4. Procedure_________
Subtask 21-52-24-020-052
A. Removal of the Heat Exchanger Unit
R **ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
(Ref. Fig. 401/TASK 21-52-24-991-001)
R **ON A/C 151-199, 401-499,
R R (Ref. Fig. 401A/TASK 21-52-24-991-001-A)
**ON A/C ALL
NOTE : Turn the sleeves (16), (88) and (59) when you move them or when____ you remove them. This will help to prevent damage to the internal seals.
(1) Remove the air conditioning pack (Ref. TASK 21-52-41-000-001).
NOTE : Make sure that the air conditioning pack is securely fastened____ in the correct support stand (Ref. CMM 215200) before you remove any of the pack components.
R 1EFF : ALL 1 21-52-24Page 446 1 1 Aug 01/05 1 1 1CES 1 Damage to the individual components could occur if it is not correctly supported.
(2)
Remove the pipe assembly (Ref. TASK 21-52-23-000-001).
(3)
Remove the clamp (9) and the sleeve (8).
(4)
Remove the nut (45), the washer (44), the bonding strap (41) and the screw (42).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(75)