• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:51来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

1 O-ring 21-52-03 27B-100 8 packing 21-52-03 27B-055 8 packing 21-52-03 27B-055A
R 1EFF : ALL 1 21-52-23Page 446 1 1 Aug 01/05 1 1 1CES 1 D. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-33-21-618-001 Pre-conditioning through the HP Ground Connection 12-33-21-618-001 Pre-conditioning with the APU 21-52-00-200-002 Detailed Visual Inspection of Pipe-Assemblies between
 the Heat Exchanger Unit, the Bypass Valve, the Anti-Ice Valve (if installed) and the Air Cycle Machine
 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-13-400-002 Installation of the Quick-Release Access Panels on the Belly Fairing Structure
 **ON A/C 001-049, 051-099, 101-105, 151-158, 201-210,
 21-52-23-991-003 Fig. 403

R **ON A/C 106-149, 159-199, 211-299, 301-399, 401-499,
 21-52-23-991-003-A Fig. 403A

R **ON A/C ALL
 3. Job Set-up
__________
 Subtask 21-52-23-860-054
 A. Aircraft Maintenance Configuration
 (1) Make sure that:
 (a) The aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).
R 1EFF : ALL 1 21-52-23Page 447 1 1 Aug 01/05 1 1 1CES 1


 (2) The access panel is removed (Ref. TASK 53-35-13-000-002), FOR 10HM13 191KB, FOR 11HM13 192KB.
 (a) On the panel 30VU:
 1_ The APU BLEED pushbutton switch is in the off position (the ON legend is off).
 2_ The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
 3_ The warning notice to tell persons not to operate these pushbutton switches is in position.
 (b) On the HP ground connector the warning notice to tell persons not to supply ground air is in position.
 Subtask 21-52-23-865-059
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 10HM13 
R  **ON A/C 401-499, 
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC  52HH  D08 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R  122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC  1HH 3HH  X22X21 
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC  4HH  Y19 

R 1EFF : ALL 1 21-52-23Page 448 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC  2HH  Y18 
R  **ON A/C 106-149, 303-399, 
R  122VU  4HH  Y19 
R  **ON A/C 401-499, 
R R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  49HH 51HH 50HH  X22 X21 Y18 
R  **ON A/C ALL
 FOR 11HM13 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 24HH 22HH  W22W21Y21Y20 
R  **ON A/C 401-499, 
R R R R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22 W21 Y21 Y20 

R 1EFF : ALL 1 21-52-23Page 449 1 1 Aug 01/05 1 1 1CES 1R **ON A/C ALL

 

 4. Procedure
_________
 **ON A/C 001-049, 051-099, 101-105, 151-158, 201-210,
 (Ref. Fig. 403/TASK 21-52-23-991-003)

R **ON A/C 106-149, 159-199, 211-299, 301-399, 401-499,
 (Ref. Fig. 403A/TASK 21-52-23-991-003-A)

R **ON A/C ALL
 Subtask 21-52-23-420-051
 A. Installation of the Pipe Assembly
 (1)
 Do the detailed visual inspection of the pipe assembly (Ref. TASK 21-52-00-200-002).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(62)