 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.

 1. Reason for the Job
__________________

 Referenced from TSM.
 This procedure is only applicable to reheaters with the P/N 755A0000-04 and
 previous.
 It is not applicable to reheaters with the P/N's 755A0000-04 Amendment A or
 subsequent.

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific hoses (7)
 No specific locally manufactured adaptors (6)
 No specific pressure gauge (8)
 No specific three-way valve (9)

R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 19-010  USA AMS 5687
 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
 (Ref. 20-31-00)

 

 C. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
 -------------------------------------------------------------------------------
2 packing 21-61-03 05 -040 2 packing 21-61-03 05 -040A
 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
12-33-21-618-001 Pre-conditioning through the HP Ground Connection 12-33-21-618-001 Pre-conditioning with the APU 21-52-00-100-002 Cleaning of the Air Conditioning Pack-Reheater 10HM3
 (11HM3) 21-52-31-000-001 Removal of the Reheater 10HM3 (11HM3) 21-52-31-400-001 Installation of the Reheater 10HM3 (11HM3) 21-61-00-710-001 Operational Test of the Pack Temperature-Control
 System 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power
 31-60-00-860-001 EIS Start Procedure
 31-60-00-860-002 EIS Stop Procedure

R 49-00-00-860-003 APU Start by External Power (GTCP 36-300)
R 49-00-00-860-004 APU Shutdown by External Power (GTCP 36-300) 49-00-00-860-005 APU Start by External Power (APS 3200) 49-00-00-860-006 APU Shutdown by External Power (APS 3200) 49-00-00-860-008 APU Start by External Power (131-9(A)) 49-00-00-860-009 APU Shutdown by External Power (131-9(A)) 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-13-400-002 Installation of the Quick-Release Access Panels on the Belly Fairing Structure CMM 215208 21-52-00-991-005 Fig. 501
 3. Job Set-up
__________
 Subtask 21-52-00-861-056
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).


 Subtask 21-52-00-865-061
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 10HM3 
R  **ON A/C 401-499,
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 52HH  D08 
R  122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC  1HH 3HH  X22X21 
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  4HH  Y19 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC **ON A/C 106-149, 303-399,  2HH  Y18 
R  122VU  4HH  Y19 
R  **ON A/C 401-499, 
R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC **ON A/C ALL 49HH 51HH 50HH  X22 X21Y18
 FOR 11HM3

 

 -------------------------------------------------------------------------------
R  PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 