• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:51来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (i) Tighten the nut (3) against the washer (1) and the support rod (72b).
 (j) Make sure that the rod-end (2) and the fixed rod-end (5) are in line with each other.
 (k) Check that the rod-end (2) is in safety.
 NOTE : A probe of diameter 0.8 mm (0.0314 in.) should not go____ through the inspection hole (4) in the support rod (72b).
 (l) Bend back the tabs of the washer (1) against the nut (3) so that it is locked and safetied.
 (m) Move the heat shrink tubing into position over the inspection hole (4) and the nut (3).

 

 (n) Use an applicable heat gun and shrink the tubing until it is tight.
 (3) For both the fixed rod-end (5) and the rod-end (2):
 (a) Remove the fixed rod-end (5) from the support rod (72b).
 NOTE : The fixed rod-end is fastened in the support rod with an____ adhesive material. Force may be necessary to release the fixed rod-end. Make sure that you do not damage the support rod (72b) when you do this.
 (b) Remove the heat shrink protective cover from the support rod (72b).
 (c) Bend back the lock tabs on the washer (1) and loosen the nut (3).
 (d) Remove the rod-end (2) together with the washer (1) and the nut (3).
 (e) Remove and discard the washer (1) and remove the nut (3) from the rod-end (2). 
R R  (f) Clean the threads of the new fixed rod-end (5) with a lint free cloth and CLEANING AGENTS (Material No. 11-004).
 (g) Apply a small quantity of adhesive, ECCOBOND 286 to the threads of the fixed rod-end (5).
 (h) Put the fixed rod-end (5) in position in the support rod (72b) and adjust it until you get the Dimension 'A'. Dimension 'A' = 281.2 +1.0 -1.0 mm (11.0708 +0.0393 -0.0393 in.).
 (i) Let the adhesive cure for the recommended time (refer to the Manufacturers Instructions). 
R R  (j) Put the nut (3) in position on the new rod-end (2) and screw it on as far as it will go. 
R  (k) Put the new washer (1) in position on the rod-end (2).
 (l) Put an applicable sized piece of heat shrink tubing on the body of the support rod (72b).

 

 (m) Put the rod-end (2) in position in the support rod (72b) and adjust it until you get the dimension 'B'. Dimension 'B' = 306.1 +0.2 -0.2 mm (12.0511 +0.0078 -0.0078 in.).
 (n) Tighten the nut (3) against the washer (1) and the support rod (72b).
 (o) Make sure that the rod-end (2) and the fixed rod-end (5) are in line with each other.
 1_ Check that the rod-end (2) is in safety.
 NOTE : A probe of diameter 0.8 mm (0.0314 in.) should not go____ through the inspection hole (4) in the support rod (72b).
 (p) Bend back the tabs of the washer (1) against the nut (3) so that it is locked and safetied.
 (q) Move the heat shrink tubing into position over the inspection hole (4) and the nut (3).
 (r) Use an applicable heat gun and shrink the tubing until it is tight.
 Subtask 21-52-00-350-051 
R  C. Replacement of the Rod-End in the Support Rod 72a (Condensor and Air Conditioning Unit) (Ref. Fig. 802/TASK 21-52-00-991-015)
 (1) Remove the heat shrink protective cover from the support rod (72a).
 (a) Bend back the lock tabs on the washer (1) and loosen the nut (3).
 (b) Remove the rod-end (2) together with the washer (1) and the nut (3).
 (c) Remove and discard the washer (1) and remove the nut (3) from the rod-end (2). 
R R  (d) Put the nut (3) in position on the new rod-end (2) and screw it on as far as it will go. 
R  (e) Put the new washer (1) in position on the rod-end (2).

 

 (f) Put an applicable sized piece of heat shrink tubing on the body of the support rod (72a).
 (g) Put the rod-end (2) in position in the support rod (72a) and adjust it until you get the dimension 'B'. Dimension 'B' = 309.3 +0.2 -0.2 mm (12.1771 +0.0078 -0.0078 in.).
 (h) Tighten the nut (3) against the washer (1) and the support rod (72a).
 (i) Make sure that the rod-end (2) is in line with the fork end.
 (j) Check that the rod-end (2) is in safety.
 NOTE : A probe of diameter 0.8 mm (0.0314 in.) should not go____ through the inspection hole (4) in the support rod (72a).
 (k) Bend back the tabs of the washer (1) against the nut (3) so that it is locked and safetied.
 (l) Move the heat shrink tubing into position over the inspection hole (4) and the nut (3).
 (m) Use an applicable heat gun and shrink the tubing until it is tight.
 Subtask 21-52-00-350-052 
R R  D. Replacement of a Rod-End in the Support Rod 83 (Heat Exchanger Unit and Air Conditioning Pack) (Ref. Fig. 802/TASK 21-52-00-991-015)
 WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THIS/THESE_______ MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK. 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(24)