• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:51来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 NOTE : The procedure is the same for the water extractor 10HM8 and 11HM8.
____
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific Torque Wrench : range 0.00 to 1.20 m.daN
 (0.00 to 9.00 lbf.ft) No specific Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-007 USA MIL-M-7866
 MOLYBDENUM DISULFIDE POWDER (Ref. 20-31-00) Material No. 04-012 USA VV-P-236
 PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00) Material No. 06-007 USA SS-G-659
 GRAPHITE POWDER DRY LUBRICANT (Ref. 20-31-00)
 1EFF : ALL 1 21-52-16Page 408 1 1 Aug 01/05R 1 1 1CES 1


 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
1 washers 1 washers 4 seals 4 seals 4 seals 4 seals 4 seals 6 nuts 6 nuts 13 packing 13 packing 13 packing
D. Referenced Information21-52-03 26 -14021-52-03 26A-14021-52-03 26 -18021-52-03 26 -180A21-52-03 26 -180B21-52-03 26 -180C21-52-03 26A-18021-52-03 26 -15021-52-03 26A-15021-52-03 26 -12021-52-03 26 -120A21-52-03 26A-120
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-33-21-618-001 12-33-21-618-001 20-26-00-910-002 21-63-00-710-004 24-41-00-861-002  Pre-conditioning through the HP Ground ConnectionPre-conditioning with the APUInstallation of Expansion JointsOperational Test of the Cockpit and Cabin Temperature Control with CFDS/MCDUEnergize the Aircraft Electrical Circuits from the External Power
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied from the External Power
 53-35-13-000-002  Removal of the Quick-Release Access Panels from the
 53-35-13-400-002  Belly Fairing StructureInstallation of the Quick-Release Access Panels on
 21-52-16-991-001 21-52-16-991-002  the Belly Fairing StructureFig. 401Fig. 402

 1EFF : ALL 1 21-52-16Page 409 1 1 Aug 01/05R 1 1 1CES 1


 3. Job Set-up
__________ Subtask 21-52-16-860-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that:
 (a)
 The aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).

 (b)
 On the panel 30VU:

 (c)
 On the HP ground connector the warning notice to tell persons not to supply ground air is in position.

 (d)
 The access panel/s is/are removed (Ref. TASK 53-35-13-000-002), 1 FOR 10HM8


 1_ The APU BLEED pushbutton switch is in the off position (the ON
 legend is off).
 2_ The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in
 the off position (the OFF legends are on).
 3_ The warning notice to tell persons not to operate these
 pushbutton switches is in position.

_
 -191KB, 2 FOR 11HM8
_
 -192KB.
 1EFF : ALL 1 21-52-16Page 410 1 1 Aug 01/05R 1 1 1CES 1


 Subtask 21-52-16-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 10HM8 
R  **ON A/C 401-499,
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 52HH  D08 
R  122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC  1HH 3HH  X22X21 
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  4HH  Y19 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC **ON A/C 106-149, 303-399,  2HH  Y18 
R  122VU  4HH  Y19 
R  **ON A/C 401-499, 
R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  49HH 51HH 50HH  X22 X21Y18
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(30)