• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:51来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 1EFF : ALL 1 21-52-21Page 435 1 1 Aug 01/05R 1 1 1CES 1


 Compressor Inlet Gasket installation. Figure 403/TASK 21-52-21-991-004
 1EFF : 1 1R 1CES  ALL  1 11 1 21-52-21 Page 436 Aug 01/05

 

 Subtask 21-52-21-865-057
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 10HM1 
R  **ON A/C 401-499,
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 52HH  D08 
R  122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC  1HH 3HH  X22X21 
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  4HH  Y19 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC **ON A/C 106-149, 303-399,  2HH  Y18 
R  122VU  4HH  Y19 
R  **ON A/C 401-499, 
R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  49HH 51HH 50HH  X22 X21Y18

 

 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C ALL
 FOR 11HM1 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 24HH 22HH  W22W21Y21Y20 
R  **ON A/C 401-499,
R R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22W21 Y21Y20 
**ON A/C ALL
 Subtask 21-52-21-710-052
 C. Test
 (1) Do the preconditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001)
 (2) Do a leak check at the connection of the compressor inlet duct to the ACM casing, the pipe assembly, the bypass and the anti ice valve connections.
 NOTE : Leaks are not permitted.____
 (3) After approximately 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) (Ref. TASK 12-33-21-618-001)
 (4) Do the operational test of the cockpit and cabin temperature control (Ref. TASK 21-63-00-710-004) system.

 

 5. Close-up
________ Subtask 21-52-21-410-052
 A. Close access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panel (Ref. TASK 53-35-13-400-002)
 FOR 10HM1
 191KB
 FOR 11HM1
 192KB

 

 (3) Remove the warning notice. Subtask 21-52-21-862-051
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002)


 MACHINE - AIR CYCLE (10HM1,11HM1) - INSPECTION/CHECK
____________________________________________________ TASK 21-52-21-200-001 Attachment Components (In-Service Wear Limits) - Air Cycle Machine 10HM1
 (11HM1)
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-52-00-300-001 Attachment Components - Repair/Replacement CMM 215202 21-52-21-991-003 Fig. 601
 3. Job Set-up
__________ Subtask 21-52-21-860-052
 A. Aircraft Maintenance Configuration
 (1) Make sure that the applicable components are disassembled to do the inspection procedure.
 4. Procedure
_________ (Ref. Fig. 601/TASK 21-52-21-991-003) Subtask 21-52-21-210-051
 A. Visual Inspection of the Spherical Bearings in the Support Rods
 (1) On the support rods (74), (75), (78) and (79):
 (a) Use an applicable measurement method and do a check for radial play at the spherical bearings (1).


R  Attachment Components Figure 601/TASK 21-52-21-991-003
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 4(44)